Field Documentation

Field Documentation

KG

13 Qs

quiz-placeholder

Similar activities

gamenoitu

gamenoitu

University

12 Qs

Role of Professional Engineer

Role of Professional Engineer

University

15 Qs

Remodeling Project Quiz

Remodeling Project Quiz

12th Grade

10 Qs

PROJECT MANAGEMENT 01

PROJECT MANAGEMENT 01

University - Professional Development

10 Qs

Project Planning (Part 1)

Project Planning (Part 1)

University - Professional Development

17 Qs

SHASSIC 2018

SHASSIC 2018

1st - 12th Grade

15 Qs

CONTRACT MODIFICATION & CHANGE ORDER

CONTRACT MODIFICATION & CHANGE ORDER

University

11 Qs

Challenge Quiz - Payment Management

Challenge Quiz - Payment Management

1st Grade

10 Qs

Field Documentation

Field Documentation

Assessment

Quiz

Other, Professional Development

KG

Medium

Created by

CSSD BOC

Used 47+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is conducted in order to address the change/major modifications encountered in the project.

Revised Plan

As-staked Surveys

As-Staked Plan

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the contractor fails to submit the as-staked plan on time for processing, the contractor shall submit to the IO a request for one (1) time extension of fifteen (15) days, depending on the project cost, to prepare the plan.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Shall be issued by the Project Engineer when As-Staked plan is not required

Certificate of No Correction

Certificate of Partial As-Stake

Certificate of No Deviation from Original Plan

Certificate of Clearance

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Shall be adopted by the DPWH as Project Scheduling Technique in DPWH Projects

PERT-CPM

Predecence Diagram Method

Network Diagram

Precedence Diagram Method

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When the actual progress is behind the planned schedule, these actions shall be taken except for one.

Notify the contractor on the delay.

Identify works that are delaying the project

Undertake calibrated action

None of these

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As a Project Engineer, this shall be issued to the contractor when a delay in the project was noted for not undertaking the scheduled works.

Inspection Report

PE Report

Site Instruction

None of these

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The contractor shall take all reasonable precautions to maintain the health and safety of his personnel based on the _________________.

Quality Control Program

Construction Safety and Health Plan

Construction Safety and Health Program

Quality Control Plan

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other