
Principles of construction 3
Authored by Debbie Reardon
Architecture
6th Grade
Used 107+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
30 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of drawing is this?
Site plan
Orthographic
Elevations
Floor plan
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of these are considered not good in the use of conserving energy?
E rated electrical goods and appliances
Ground source heat pumps
Biomass heating
Solar power - Wind power
Answer explanation
The pictures is a clue as E rated goods are red
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Construction uses a lot of water - saving water can be done by recycling or water harvesting - how can this water be re-used once filtered?
Showers
Drinking water
Baths
Toilet - washing machines - gardens
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the formula for calculating foundations?
Length x width x depth
Length x width
2 (length x width x depth)
2 (length x width)
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of foundation is this picture showing?
Pile
Wide strip
Raft
Strip
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of foundation is this picture showing?
Raft
Strip
Wide strip
Pile
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Services are generally brought to a building underground - which one of these would not be delivered underground to a house?
Ventilation
Waste water (sewage)
Internet / Cable TV / Communications
Electricity/Water/Gas
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?