Well Completion Basics

Well Completion Basics

Professional Development

6 Qs

quiz-placeholder

Similar activities

Quiz 3

Quiz 3

Professional Development

10 Qs

SKG 16.2 Production Operation Day 5

SKG 16.2 Production Operation Day 5

Professional Development

5 Qs

Familiarisasi SWA

Familiarisasi SWA

Professional Development

10 Qs

Sehat Bugar Segar (Sesi I)

Sehat Bugar Segar (Sesi I)

Professional Development

10 Qs

CSP Week2 Trivia 03

CSP Week2 Trivia 03

2nd Grade - Professional Development

7 Qs

Construction Safety_2

Construction Safety_2

Professional Development

10 Qs

DreamBox Learning Environment (Grades K-2)

DreamBox Learning Environment (Grades K-2)

Professional Development

9 Qs

Guild Wars 2

Guild Wars 2

KG - Professional Development

10 Qs

Pre-Test Refreshment PTK 007

Pre-Test Refreshment PTK 007

Professional Development

10 Qs

PKT Supply_Week-2_June'22

PKT Supply_Week-2_June'22

Professional Development

10 Qs

Team: LEARNING

Team: LEARNING

Professional Development

7 Qs

CSP Week 4 Trivia 02

CSP Week 4 Trivia 02

2nd Grade - Professional Development

7 Qs

Oil and Gas 1

Oil and Gas 1

Professional Development

10 Qs

Salam 5 Jari Reborn

Salam 5 Jari Reborn

Professional Development

10 Qs

SKG 16.2 Production Operation Day 4

SKG 16.2 Production Operation Day 4

Professional Development

5 Qs

Well Completion Basics

Well Completion Basics

Assessment

Quiz

Other

Professional Development

Medium

Created by

Chai Fu

Used 9+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Media Image

Which diagram shows well completion?

A

B

A and B

None of the answer

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Completion involves

connecting the borehole and payzone

treating the payzone

equipping the well

all of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Which of the colour highlighted shows upper completion?

red

blue

red and blue

none of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Upper completion involves

sand control

perforation either using TCP or wireline

running and installation of production tubing and accesories

all of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The lower completion involves

running and installing production tubing

installing wellhead

perforation either using TCP or wireline

all of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The well completion operation may be carried out using

drilling rig

workover rig

drilling rig or workover rig

none of the answer