Seminar on Project Documentation - QA & QC Procedures

Authored by Neilsen Campit

Specialty, Professional Development, Other

Professional Development

Used 16+ times

Seminar on Project Documentation - QA & QC Procedures
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

A documented proof attesting that the quality of construction materials fails or meets the specifications requirement.

Materials Test Report

Materials Inspection Report

Manufacturer's Certificate

Certificate of Quality Control and Assurance

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Specifically, the objectives of calibration are: to check the __________ of the instrument and; to determine the __________ of the instrument.

precision and traceability

accuracy and traceability

accuracy and derivability

mastery and accountability

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

It is the basic means or a tool by which an engineer or an inspector can use to determine whether the materials should be allowed to be incorporated or be rejected into the works:

Materials Test Report

Materials Inspection Report

Materials Testing

Manufacturer's Certificate

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

What is the description of DPWH Department Order No. 188, Series of 2022?

Revised Guidelines for the Calibration of Testing Equipment of the DPWH Implementing Offices

Revised Schedule of Fees and Charges for Laboratory Testing of Construction Materials

Standard Forms in Project Implementation

Integration of Quality Assurance Units from Central and Regional Offices and Reconstitution of QAU

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

The services of accredited private testing laboratories can only be availed by the contractor to test construction materials in behalf of DPWH after securing of what approved document?

Authorization Letter from the Project Engineer

Private Laboratory’s Certificate of Accreditation

Approved Sample Card

Waiver issued by DPWH Testing Laboratory

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

The following are the causes of the inaccuracy of laboratory testing equipment/apparatus EXCEPT:

Normal Wear and Tear

Electric or Mechanical Shock

Extended Use

Capital

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Who must submit construction material sample/s to be tested in the laboratory if it passes or fails the specifications requirement?

The DPWH Materials Engineer/Materials-in-Charge

A Contractor’s Authorized Representative

The Project Engineer

Both The DPWH Materials Engineer/Materials-in-Charge and A Contractor’s Authorized Representative

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?