1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
A documented proof attesting that the quality of construction materials fails or meets the specifications requirement.
Materials Test Report
Materials Inspection Report
Manufacturer's Certificate
Certificate of Quality Control and Assurance
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Specifically, the objectives of calibration are: to check the __________ of the instrument and; to determine the __________ of the instrument.
precision and traceability
accuracy and traceability
accuracy and derivability
mastery and accountability
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
It is the basic means or a tool by which an engineer or an inspector can use to determine whether the materials should be allowed to be incorporated or be rejected into the works:
Materials Test Report
Materials Inspection Report
Materials Testing
Manufacturer's Certificate
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
What is the description of DPWH Department Order No. 188, Series of 2022?
Revised Guidelines for the Calibration of Testing Equipment of the DPWH Implementing Offices
Revised Schedule of Fees and Charges for Laboratory Testing of Construction Materials
Standard Forms in Project Implementation
Integration of Quality Assurance Units from Central and Regional Offices and Reconstitution of QAU
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The services of accredited private testing laboratories can only be availed by the contractor to test construction materials in behalf of DPWH after securing of what approved document?
Authorization Letter from the Project Engineer
Private Laboratory’s Certificate of Accreditation
Approved Sample Card
Waiver issued by DPWH Testing Laboratory
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
The following are the causes of the inaccuracy of laboratory testing equipment/apparatus EXCEPT:
Normal Wear and Tear
Electric or Mechanical Shock
Extended Use
Capital
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Who must submit construction material sample/s to be tested in the laboratory if it passes or fails the specifications requirement?
The DPWH Materials Engineer/Materials-in-Charge
A Contractor’s Authorized Representative
The Project Engineer
Both The DPWH Materials Engineer/Materials-in-Charge and A Contractor’s Authorized Representative
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?