PRE-TEST TYPE A

PRE-TEST TYPE A

KG

15 Qs

quiz-placeholder

Similar activities

Engineering Design Process

Engineering Design Process

7th - 12th Grade

18 Qs

Understanding By Design Review

Understanding By Design Review

Professional Development

14 Qs

NPTEL Ethics in Engineering week 1 A

NPTEL Ethics in Engineering week 1 A

12th Grade

15 Qs

ECE FIELD

ECE FIELD

4th Grade

20 Qs

What is Engineering?

What is Engineering?

8th Grade

16 Qs

What's your "credit" Score?

What's your "credit" Score?

Professional Development

11 Qs

Machinist Grinder 4th Sem - NSQF - Module 5 : Lapping and Honing

Machinist Grinder 4th Sem - NSQF - Module 5 : Lapping and Honing

Professional Development

20 Qs

Engineering Design Process

Engineering Design Process

8th Grade

15 Qs

PRE-TEST TYPE A

PRE-TEST TYPE A

Assessment

Quiz

Instructional Technology, Special Education, Professional Development

KG

Hard

Created by

PRAKTIKUM MANUFAKTUR

Used 12+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manufacturing process converts unfinished materials to finished product, often using machines or machine tools is definition by…

Sutalaksana (2006)

Groover (2020)

Scallan P (2003)

  J T. Black (2013)

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one from the following statements about Advantage of Process Planning is incorrect? 

Gives an organization a sense of direction.

Calculate manufacturing parameters and costs.

The system cannot be change easily

Can reduce the required skilled planner

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many types of Assembly operation?

Two

Four

Three

One

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Transforms a work material from one state of completion to a more advanced state that is closer to the final desired product is definition of

Processing Operation

Shaping process

Property - enhancing processes

Surface processing operation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Based on the picture, what is the name of this symbol in OPC?

Inspection

  Transportation

Operation

Storage

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below are the advantage Computer Aided Process Planning, except … 

High-cost task

Improve legibility

Increased productivity of process planner

Deficiency productivity of process planner

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Factors like color, texture, smoothness, and finish are determined by the aesthetics or appearance of the final product is definition of…

Environmental Factors

Aesthetic and Appearance

  Service Life Durability

Cost  

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?