Fire Insp & Code Enf Ch 15

Fire Insp & Code Enf Ch 15

Professional Development

63 Qs

quiz-placeholder

Similar activities

Soal Tertulis Seleksi Perangkat Desa

Soal Tertulis Seleksi Perangkat Desa

Professional Development

60 Qs

FFH Final Quiz

FFH Final Quiz

Professional Development

67 Qs

Latihan UP PPG 04

Latihan UP PPG 04

Professional Development

60 Qs

MBI CSEC IT Computer fundamentals

MBI CSEC IT Computer fundamentals

7th Grade - Professional Development

60 Qs

AUT203 Mid Term

AUT203 Mid Term

Professional Development

60 Qs

Mock Test Part 1

Mock Test Part 1

Professional Development

60 Qs

Nokia Subcontractor-19

Nokia Subcontractor-19

Professional Development

60 Qs

Economics - Kaun Banega CA

Economics - Kaun Banega CA

Professional Development

60 Qs

Fire Insp & Code Enf Ch 15

Fire Insp & Code Enf Ch 15

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Skylar Parkerson

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 5 pts

Atriums and open shafts connecting two or more stories are permitted if they are provided with adequate smoke control, automatic sprinkler system protection, and: Page 682
fire barriers
smoke dampers
fire stops
fire suppression systems

2.

MULTIPLE CHOICE QUESTION

5 mins • 5 pts

Which of the following is MOST likely to contribute to fire spread or smoke development? Page 683
Insulation materials
combustible materials
inadequate housekeeping
hazardous materials

3.

MULTIPLE CHOICE QUESTION

5 mins • 5 pts

To verify that structures that are new, remodeled, or that have a change in occupancy classification meet the requirements of locally adopted building and fire codes, the AHJ establishes a ___ and ___. Page 651
plans review
permitting process
acceptance testing
preacceptance testing

4.

MULTIPLE CHOICE QUESTION

5 mins • 5 pts

True or false: Policies established by the AHJ will dictate the procedures for accepting field changes. Page 652
True
False

5.

MULTIPLE CHOICE QUESTION

5 mins • 5 pts

What is the main reason local governments require construction permits and plans review? Page 652
Community safety
Money
Citation issuance
Enforce power

6.

MULTIPLE SELECT QUESTION

5 mins • 5 pts

What areas are included in the plans review process? Page 653
Construction standards
Firefighters and emergency responder safety
Input in design process
Information about construction projects
Correcting errors

7.

MULTIPLE SELECT QUESTION

5 mins • 5 pts

What are the two reasons an inspector should visit sites often? Pages 653-654
To verify that each code requirement is being met based on the approved plan
To verify that fire and life safety requirements needed during construction are met.
To make frequent, less through inspections
To issue citations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development