Scheduled Waste Training

Scheduled Waste Training

3rd Grade

12 Qs

quiz-placeholder

Similar activities

L2 Above Ground Drainage Systems Pt1

L2 Above Ground Drainage Systems Pt1

1st - 3rd Grade

16 Qs

Environmental Hygiene

Environmental Hygiene

1st - 3rd Grade

11 Qs

Earth Day Pictionary

Earth Day Pictionary

KG - Professional Development

12 Qs

BES School Safety

BES School Safety

KG - University

11 Qs

Daily Quiz 15th May 2020

Daily Quiz 15th May 2020

KG - Professional Development

15 Qs

Discussion - Pedagogical Implications

Discussion - Pedagogical Implications

KG - Professional Development

12 Qs

12. Procurement Management

12. Procurement Management

1st - 3rd Grade

12 Qs

Lean six sigma

Lean six sigma

1st Grade - Professional Development

10 Qs

Scheduled Waste Training

Scheduled Waste Training

Assessment

Quiz

Professional Development

3rd Grade

Medium

Created by

Samat Braun

Used 5+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Under Environmental Quality (Scheduled Wastes) Regulations, 2005, a scheduled waste defined as

“Any waste falling within the categories of wastes listed in the EQA 1974”

“Any waste falling within the categories of wastes listed in the First Schedule”

Domestic Waste

Food Waste

2.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Every waste generator shall ensure that all his employees involved in the identification, handling, labelling, transportation, storage and spillage or discharge response of scheduled wastes attend training programmes.

Section 10 (SW Regulation 2005)

Section 2 (SW Regulation 2005)

Section 15 (SW Regulation 2005)

Section 14 (SW Regulation 2005)

3.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Metal and metal-bearing wastes

SW 1

SW 2

SW 3

SW 4

4.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

The identification of scheduled wastes can be made through:-

Source of waste generated.

Types of process/ activities.

Physical and chemical compositions of the waste.

SDS –Safety Data Sheet (of the raw materials used)

All of asnwer

5.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Media Image

The pictogram refer to

Reactivity

Corrosive

Flammable

Toxic

6.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Media Image

The pictogram refers to

Reactivity

Corrosive

Flammable

Toxic

7.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Scheduled Waste Storage Period 

180 days or less after its generation

The quantity of scheduled wastes accumulated on site shall not exceed 20 metric tonnes

Directive from the Director General

All of answer

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?