Planning a Project

Planning a Project

11th - 12th Grade

6 Qs

quiz-placeholder

Similar activities

Profesi Multimedia 4.0

Profesi Multimedia 4.0

10th - 11th Grade

10 Qs

DC Parallel Circuits (Part 1)

DC Parallel Circuits (Part 1)

11th Grade

11 Qs

Quiz 2: Earthing Network System

Quiz 2: Earthing Network System

11th Grade - University

10 Qs

FINANCIAL MANAGEMENT

FINANCIAL MANAGEMENT

1st - 12th Grade

10 Qs

Final Ethics Quiz

Final Ethics Quiz

9th Grade - University

10 Qs

General Awareness

General Awareness

12th Grade - University

10 Qs

Target indication

Target indication

1st - 12th Grade

10 Qs

Planning a Project

Planning a Project

Assessment

Quiz

Professional Development

11th - 12th Grade

Hard

Created by

John Acevedo

Used 5+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The process of analyzing solutions should include:

Developing criteria for comparing options, such as time, cost, resources, facilities, external approvals needed, and risk assessments

Listing the pros and cons of each option

Preparing a briefing to present your findings and make recommendations to the commander on what you feel is the best solution

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

In STEP 5: DECIDE The staff...

Gather the information

Creates the Memorandum of Instruction

briefs the commander.

Calls the Point of contact of the venue

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

To develop the plan, follow these steps:

Visualize the event

Develop a resource list (all the physical things you need to accomplish the mission)

All of the above

Begin coordination (internal/external)

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

From this analysis comes the development of the Memorandum of Instruction (MOI). Your written order or MOI should include:

Concept of the Operation:

Mission Statement:

Supply and Logistics:

All the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

What Staff member figures out what are the personnel requirements? and Awards?

Battalion commander

S1

S2

S8

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

After project implementation, the executive officer coordinates an

After Action Review

After Event Review

After Review of the Event

After Action Assessment

Discover more resources for Professional Development