Search Header Logo

PIPE Quiz for Bucharest Site

Authored by Raul Raymond Kapuno

Science

Professional Development

Used 1+ times

PIPE Quiz for Bucharest Site
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name of the DBS PIPE Mascot

Bulby

Pipy

Brainy

Idy

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is the methodology that considers doing more with less.

Lean

Efficient

Optimum

Value

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Lean Tools can be classified based on the following except ...

Information Flow

People Flow

Material Flow

Process Flow

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Activities that consume time, resources and space, but do not contribute to satisfy customer needs

Product

Value

Waste

Trash

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inaccuracy can be classified as what type of waste?

excess process

waiting

not using people's talent

defect

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Gemba is roughly translated from Japanese as

the real thing

the real place

the right place

the right thing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It helps to see and understand the flow of material and information as a product makes way through the process

Process Flow

Process Map

Value Stream Map

Value Stream

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?