Select a correct name of the part shown in the figure.

4th Class_Horizontal drilling technology

Quiz
•
Physics
•
University
•
Medium
Used 2+ times
FREE Resource
8 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
45 sec • 10 pts
Kick off point
Horizontal section
Vertical part
End of curve
2.
MULTIPLE CHOICE QUESTION
45 sec • 10 pts
How many degrees or more the horizontal section has to be at an angle to the vertical section to be defined as a horizontal well?
> 70º
> 75º
> 80º
> 85º
3.
MULTIPLE SELECT QUESTION
2 mins • 20 pts
Select all the correct advantage(s) of horizontal well compared with vertical well
Decreasing the drainage area
Improving productivity in shallow reservoir
Escalating the gas/water coning problems
The cost of horizontal drilling is cheaper than that of vertical drilling
Improving productivity in fractured reservoirs by intersecting a numbers of vertical fractures
4.
MULTIPLE SELECT QUESTION
2 mins • 20 pts
Select all the correct disadvantage(s) of horizontal wells.
Low overall current commercial success rate.
Only one zone at a time can be produced using a horizontal well.
Hole cleaning and Frictional forces.
More costly than vertical wells.
5.
MULTIPLE CHOICE QUESTION
45 sec • 10 pts
How much higher is the cost of horizontal drilling than that of the same length of vertical drilling?
1.5 to 2.5 times higher
2.5 to 3.5 times higher
3.5 to 4.5 times higher
4.5 to 5.5 times higher
6.
MULTIPLE CHOICE QUESTION
1 min • 15 pts
How can the drill bit be rotated in the horizontal drilling?
by the turn table
by the electric motor
by the downhole mud motor
by the mental power of drilling engineers
7.
MULTIPLE CHOICE QUESTION
30 sec • 10 pts
How can the drilling direction be changed in the horizontal drilling?
by using the psychokinesis
by using the soft drilling pipes
by using curved drilling pipes
by installing the bent sub between the drilling pipe and downhole motor
8.
MULTIPLE CHOICE QUESTION
45 sec • 10 pts
How can the cutting force be supplied to the drill bit in the horizontal drilling?
by injecting water at high pressure
by using the principles of lever
by using the heavy weight drill pipes
by installing the springs in the drilling pipes
Similar Resources on Quizizz
10 questions
PROJECTILE MOTION

Quiz
•
9th Grade - University
10 questions
Projectile Motion Quiz

Quiz
•
University
11 questions
Understanding Graphing Motion Concepts

Quiz
•
11th Grade - University
10 questions
Projectile Motion 1.0

Quiz
•
University
10 questions
Horizontal Projectiles Mastery Quiz

Quiz
•
11th Grade - University
13 questions
Trial UPS

Quiz
•
University
13 questions
Tiro parabólico

Quiz
•
University
13 questions
Kinematic in 2D

Quiz
•
University
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade