
Quiz 05 - SPP & BLDG LAWS
Authored by King Est
Architecture
Professional Development
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
Construction in a building, involving changes in the materials used, partitioning, locations/sizes of openings, structural parts, existing utilities and equipment without increasing the overall area.
Alteration
Renovation
Slum upgrading
Redecoration
2.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
What is the minimum distance required between eaves and the rear and side property lines?
500mm
750mm
1000mm
None of the above. Setbacks are measured not to the eaves, but to the exterior faces of the walls
3.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
For agricultural areas, the NBC requires at least ______ of easement for each side of waterway
3.00m
10.00m
20.00m
40.00m
4.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
This uses wood construction with protective fireresistant materials and is one-hour fire resistive throughout
Type I
Type II
Type III and IV
Type V
5.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
According to the NBC, the maximum speed of escalator is
90 feet per minute
120 feet per minute
36 meters per minute
38 meters per minute
6.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
Fires in cooking appliances that involve combustible cooking media (vegetable or animal oils and fats) are classified as:
Class K
Class D
Class B
Class A
7.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
What is the minimum level of completion required for PD 957?
Shell house
Shell house with doors and windows
Complete house
Complete house without interior partitions
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?