Inspection and testing live tests

Inspection and testing live tests

Professional Development

36 Qs

quiz-placeholder

Similar activities

HCMA 115 Week 3 test review

HCMA 115 Week 3 test review

Professional Development

32 Qs

WLD-112 Basic Welding (Midterm)

WLD-112 Basic Welding (Midterm)

11th Grade - Professional Development

35 Qs

Saint Nick's Christmas Quiz

Saint Nick's Christmas Quiz

Professional Development

35 Qs

Top 200 Brand Generic Drugs Pharmacology Quiz B

Top 200 Brand Generic Drugs Pharmacology Quiz B

12th Grade - Professional Development

36 Qs

SKB PPKN Pedagogik

SKB PPKN Pedagogik

1st Grade - Professional Development

38 Qs

Outdoor Emergency Care Chapter 15

Outdoor Emergency Care Chapter 15

Professional Development

37 Qs

Chapter 9 Fire Forcible Entry

Chapter 9 Fire Forcible Entry

Professional Development

32 Qs

LAP Year 3

LAP Year 3

Professional Development

33 Qs

Inspection and testing live tests

Inspection and testing live tests

Assessment

Quiz

Specialty

Professional Development

Practice Problem

Medium

Created by

Stephen Watt

Used 46+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the direct departure from BS7671 when a measured value of Ipf considerably exceeds those permitted for the protective devices installed at the point of test?

Earth fault disconnection times will be exceeded

Devices will safely interrupt the fault in time

Devices will not safely interrupt the fault in time

      Disconnection times will be exceeded

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum permitted disconnection time for 100ma RCD to BSEN 61008 in order to meet specified time/current performance, when tested at 1xI n?

40ms

100ms

200ms

300ms

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is used to establish phase sequencing for an installation

Frequency meter

Power factor indicator

Rotating disc instrument

Earth fault loop impedance tester

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the range tests that are carried out for RCD’s

½ x I△n  – 150 x I△n

½ x I△n –1 x I△n

½ x I△n  – 2 x I△n – 150 x I△n   

½ x I△n  – 2 x I△n – 5 x I△n 

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Functional tests are to be carried out on a general purpose RCD using a RCD tester. At which point during the testing process would the effectiveness of the test button on the RCD be checked.

Before the instrument test

Following all instrument tests

Following the 0.5 X I n test but before the 1 x I△n test

At no point as the instrument tests will carry out these functions

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The current measured between line and neutral at the origin of an electrical installation forming part of a TT system would be recorded as the

Design current

Nominal Current

Rated current

Prospective fault current

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The relationship between the maximum measured (Ipf) and the breaking capacity of any protective device is that the device breaking capacity is

Greater than the measured Ipf

Lower than the measured Ipf

Lower for ring circuits

Lower for radial circuits

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?