PP412 - 4A

PP412 - 4A

1st - 3rd Grade

30 Qs

quiz-placeholder

Similar activities

architecture cultural

architecture cultural

3rd Grade

30 Qs

FPCf

FPCf

1st Grade - University

30 Qs

FINAL EXAM

FINAL EXAM

3rd Grade

25 Qs

guess the animal

guess the animal

1st - 5th Grade

25 Qs

History 13 (2)

History 13 (2)

1st Grade

25 Qs

09.06.2023

09.06.2023

1st - 5th Grade

27 Qs

SEERAH QUIZ  JUNIOR

SEERAH QUIZ JUNIOR

1st - 5th Grade

30 Qs

Sydney Trains!

Sydney Trains!

2nd Grade - Professional Development

28 Qs

PP412 - 4A

PP412 - 4A

Assessment

Quiz

Architecture

1st - 3rd Grade

Hard

Created by

Popol Kupa

Used 9+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

If an architect is hired to design a supermarket with construction cost of 40M pesos, how much should he/she charge as Recommended Professional Fee under a DAEDS (Detailed Architectural and Engineering Design Services) arrangement? 

5%

6%

7%

8%

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Why does an Architect need an Accountant?

To know if he/she is financially stable

To keep his books and accounts in order

To hide his income

8%To prepare his/her SALN

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

If the owner requests additional work (e.g. revisions in construction drawings) from the architect due to change orders, what method of compensation should the Architect employ?

Cost Method

Lump Sum

Percentage of Construction Cost

Time-based method like MDPE

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The material specified in the contract is not readily available in the market and waiting for it will incur a substantial delay and consequently losses. Who can have it replaced by a suitable material?

Contractor

Architect-In-Charge of Construction

Architect-of-Record

Owner

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

An Architect makes a miniature model of the project for his own design study.  Who should pay for it?

Architect

Project Manager

Contractor

Owner

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

According to the compensation guidelines, how much of the architect’s fee is for the civil liability for the design mandated by Article 1723 of the Civil Code?

15%

10%

5%

NOT SPECIFIED IN THE GUIDELINES

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the standard progress of payment for an Architect’s fee based on project phase?

 5%-10%-35%-85%-95%-100%

5%-15%-35%-85%-95%-100%

5%-20%-40%-9-%-100%

5%-15%-35%-85%-100%

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?