Search Header Logo

Heat Pump Final Review

Authored by Alejandro Rodriguez

Other

University

Used 4+ times

Heat Pump Final Review
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

79 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

In order to provide time delay between stages of electric heat, the controls that are used are called ____________________.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One potential safety hazard that all technicians should be aware of when working on an electric furnace is that there are many exposed electrical connections behind the inspection panels.

True

False

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

A set of contacts actuated by a bimetal strip with a low-voltage wire wrapped around it is called a(n) ____________________.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

For each watt of electrical power, ____________________ Btu/h are generated.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following elements is not a power-consuming device?

The sequencer heater coil.

A magnetic solenoid that moves the armature in a contactor.

The contacts of a contactor.

The blower motor.

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

If the fan were to fail and the limit switch stuck closed, the element would be cut off by the ____________________.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Radiant electric heating panels used for ceiling installation are often made of ____________________ with wire heating circuits running throughout.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?