SE 2022-Q2

SE 2022-Q2

1st - 10th Grade

8 Qs

quiz-placeholder

Similar activities

Wind Energy

Wind Energy

9th - 10th Grade

13 Qs

Uses of animals

Uses of animals

1st Grade

12 Qs

Nature

Nature

2nd - 5th Grade

10 Qs

Rate of chemical reactions

Rate of chemical reactions

9th Grade

10 Qs

Energy and Motion- Skills Evaluation

Energy and Motion- Skills Evaluation

3rd Grade

10 Qs

Chapter 16.1 People & Their Environment

Chapter 16.1 People & Their Environment

8th Grade

13 Qs

Eclipses

Eclipses

KG - Professional Development

11 Qs

Science Measuring light intensity

Science Measuring light intensity

4th Grade

10 Qs

SE 2022-Q2

SE 2022-Q2

Assessment

Quiz

Science

1st - 10th Grade

Practice Problem

Hard

Created by

Farshad SE 2022-TA

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 2 pts

The left side of "V model" is usually more challenging than the right side

True

False

No Sure

2.

DRAW QUESTION

10 sec • 5 pts

How would you connect the followings

Media Image

3.

FILL IN THE BLANK QUESTION

1 min • 5 pts

The purpose of the Integration Process is to realize the system-of-interest by progressively combining system elements in accordance with the BLANK requirements and the integration strategy.

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The Integration Process includes this activity

Architectural design requirements

Define integration strategy

Results of testing

None

5.

FILL IN THE BLANK QUESTION

1 min • 10 pts

The purpose of the Verification Process is BLANK that all requirements are fulfilled by the system elements and eventual system-of-interest, i.e. that the system has been built right.

6.

MULTIPLE CHOICE QUESTION

30 sec • 10 pts

Which answer is an enabler to Verification, Validation and Integration

Project procedures & processes

Requirements

Verification Traceability

Matrix (RVTM)

Enterprise Infrastructure

Agreements

7.

MULTIPLE CHOICE QUESTION

45 sec • 12 pts

One of the common approaches of Validation process is

A) The system design team uses the results of this activity to forecast success...

B) The system design team uses the results of this activity to to provide requirement design details.

A and B

None

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?