English6

English6

University

50 Qs

quiz-placeholder

Similar activities

Structural 2 (CTTO)

Structural 2 (CTTO)

University

50 Qs

VDA - Metal (Part 1)

VDA - Metal (Part 1)

University

55 Qs

HOA 4  (CTTO)

HOA 4 (CTTO)

University

49 Qs

International Architecture 1

International Architecture 1

University

52 Qs

Design 1 (CTTO)

Design 1 (CTTO)

University

50 Qs

RA No. 9266 Sections

RA No. 9266 Sections

University

47 Qs

Filipino Buildings 1

Filipino Buildings 1

University

52 Qs

Southeast Asian Architecture

Southeast Asian Architecture

University

50 Qs

English6

English6

Assessment

Quiz

Architecture

University

Medium

Created by

JBK JBK

Used 412+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. The universal power unit is a _____________________ based machine with a slewing capacity of 360 0.
Tracked
Wheeled
Universe
Multi-purposed
Limited

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. ________________ excavators are machines which have been designed specifically to carry out one mode of excavation.
Purpose designed;
Universal;
Multi-purpose;
Best;
Well-designed;

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. _____________excavators are designed to carry out small excavation operations of low output quickly and efficiently.
Multi purpose;
Purpose designed;
Universal;
Best;
Well-designed;

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. Skimmers are seldom used today because of their _________________.
Limitations;
Slewing capacity;
Universe;
Acting as pusher;
Shallow excavations;

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right option of answer. __________ is responsible for setting out of a building.
A contractor;
An architect;
A designer;
A civil engineer;
A competent person;

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right option of answer. The objective of setting out trenches is to ___________________.
Establish the excavation size, shape and direction and the width, and position of the walls;
Establish the excavation size, shape and direction;
Establish the width, and position of the walls;
Coincide the building line;
Mark on the profile;

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right option of answer. The base line very often coincides with _____________.
Building line;
Site profile;
Position of the walls;
Outline profile;
Painted band;

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?