English6

English6

University

50 Qs

quiz-placeholder

Similar activities

HOA 3 (CTTO)

HOA 3 (CTTO)

University

49 Qs

UAP Docs 200-209 Part 2

UAP Docs 200-209 Part 2

University

45 Qs

Prof Prac CTTO

Prof Prac CTTO

University

49 Qs

Filipino Architects 3

Filipino Architects 3

University

52 Qs

Structural Fundamentals 1

Structural Fundamentals 1

University

52 Qs

PH NBC - PD 1096

PH NBC - PD 1096

University - Professional Development

45 Qs

Professional Practice - Laws

Professional Practice - Laws

University

50 Qs

Renaissance Architecture 1

Renaissance Architecture 1

University

45 Qs

English6

English6

Assessment

Quiz

Architecture

University

Medium

Created by

JBK JBK

Used 412+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. The universal power unit is a _____________________ based machine with a slewing capacity of 360 0.
Tracked
Wheeled
Universe
Multi-purposed
Limited

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. ________________ excavators are machines which have been designed specifically to carry out one mode of excavation.
Purpose designed;
Universal;
Multi-purpose;
Best;
Well-designed;

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. _____________excavators are designed to carry out small excavation operations of low output quickly and efficiently.
Multi purpose;
Purpose designed;
Universal;
Best;
Well-designed;

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose correct answer. Skimmers are seldom used today because of their _________________.
Limitations;
Slewing capacity;
Universe;
Acting as pusher;
Shallow excavations;

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right option of answer. __________ is responsible for setting out of a building.
A contractor;
An architect;
A designer;
A civil engineer;
A competent person;

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right option of answer. The objective of setting out trenches is to ___________________.
Establish the excavation size, shape and direction and the width, and position of the walls;
Establish the excavation size, shape and direction;
Establish the width, and position of the walls;
Coincide the building line;
Mark on the profile;

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the right option of answer. The base line very often coincides with _____________.
Building line;
Site profile;
Position of the walls;
Outline profile;
Painted band;

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?