PM boot 4

PM boot 4

1st - 5th Grade

8 Qs

quiz-placeholder

Similar activities

PM Boot - 3

PM Boot - 3

1st - 5th Grade

7 Qs

PM Pillar

PM Pillar

1st - 5th Grade

8 Qs

Tìm hiểu Tết Trung thu

Tìm hiểu Tết Trung thu

1st - 5th Grade

12 Qs

BÀI 1: THIÊN CHÚA SÁNG TẠO VÀ QUAN PHÒNG

BÀI 1: THIÊN CHÚA SÁNG TẠO VÀ QUAN PHÒNG

5th Grade

13 Qs

TEST KIẾN THỨC - LỚP ĐÀO TẠO VÀ XÂY DỰNG NỀN TẢNG

TEST KIẾN THỨC - LỚP ĐÀO TẠO VÀ XÂY DỰNG NỀN TẢNG

KG - 1st Grade

12 Qs

ÔN TẬP HIỆU QUẢ - CNMTR

ÔN TẬP HIỆU QUẢ - CNMTR

KG - 12th Grade

10 Qs

Nội quy lao động & PCGD

Nội quy lao động & PCGD

1st Grade

10 Qs

Quiz 1. Power

Quiz 1. Power

1st Grade - University

10 Qs

PM boot 4

PM boot 4

Assessment

Quiz

Special Education

1st - 5th Grade

Hard

Created by

Phượng Huỳnh

Used 3+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MMP Loss Codes thuộc Legal Losses là loss nào? ​

Idle time

Shift Pattem

ChangeOver Time

External/ Legal

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

EWO Complete thuộc KPI hay KAI​

KPI

KAI

Cả 2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PM step 3 là gì?​

Breakdown​

Dark Factory​

Time-Base Mantenance​

Tất cả ý kiến trên là đúng

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Để phân tích EWO,PM đang sử dụng công cụ digital nào?

PM web

Buildapp

ALC

DMS

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Trong Breakdown Root Cause Types có Time Period?

Break-in or Start-Up

Normal Life

Design Weakness

Cả A và B đúng

Tất cả phương án đều đúng

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MTBF là gì?​

Mean Time To Repair/replace 

Number of Breakdowns

Maintenance Downtime (% of Breakdown Failure)

Mean Time Between Failure 

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Planned Stoppages to Maintain Basic Conditions?​

Operator (AM focus)​

Line Team leader (Organizing work)​

To give the equipment owners to execute activities to bring the line in basic conditions​

Cả A và B đúng

Tất cả phương án đúng

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Maintenance KPI Evolution – PM work order completed – Target Step 3 là bao nhiêu %?​

85%

90%

95%

100%