1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is the shortest possible time in which the activity can be finished. It assumes that everything goes well.

Optimistic

Pessimistic

Most Likely

Accurate

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  • The longest possible time required to perform an activity under extremely bad conditions

Optimistic

Pessimistic

Most Likely

Accurate

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Critical path is the

shortest time path in a network 

longest time path in a network 

efficient time path in a network 

optimal time path in a network 

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Activities with zero slack lie on a

Non-Critical path

Critical path

Normal path

Crash path

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A ______ is a graphical representation of arrows and nodes for showing logical sequence of activities performed to achieve a project objectives.

Bar

Network

Chart

Diagram

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If duration of each activity in a project scheduling is not known with certainty then ____ network model is used

CPM

PERT

PEST

Deterministic

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ analysis is used for planning, scheduling and controlling large complex projects.

Transportation

LPP

Network

Assignment

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?