Sakura-DesignManual Quiz

Sakura-DesignManual Quiz

1st - 5th Grade

12 Qs

quiz-placeholder

Similar activities

quiz 2 (Topik 2.3: Rawatan Haba)

quiz 2 (Topik 2.3: Rawatan Haba)

4th Grade

12 Qs

Warsztaty architektury krajobrazu

Warsztaty architektury krajobrazu

3rd Grade

10 Qs

Kuiz Bab 2 Pengurusan Projek

Kuiz Bab 2 Pengurusan Projek

1st - 3rd Grade

15 Qs

Activa tu pensamiento

Activa tu pensamiento

1st Grade

10 Qs

Fundamental of Mechanic Structure - Introduction

Fundamental of Mechanic Structure - Introduction

1st - 10th Grade

10 Qs

Roblox studio quiz!

Roblox studio quiz!

KG - Professional Development

9 Qs

T1: BAB 2-PENGURUSAN PROJEK

T1: BAB 2-PENGURUSAN PROJEK

1st - 3rd Grade

17 Qs

Cinematography #1

Cinematography #1

1st - 12th Grade

11 Qs

Sakura-DesignManual Quiz

Sakura-DesignManual Quiz

Assessment

Quiz

Design

1st - 5th Grade

Practice Problem

Medium

Created by

Mark R

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

For Sakura PJ, what is the material grade used for H-shape and Cut-tee?

TIS 1227-2558 SM520B

TIS 1227-2558 SM520B

ASTM A572M Gr 50

ASTM A36M

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the minimum compressive strength at 28days of structural concrete (in-situ) for Sakura PJ?

27 MPa

28 MPa

29 MPa

30 MPa

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

General support condition for a full steel piperack is _______ ?

Fixed

Pinned

Enforced But

Free

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

General support condition for a reinforced concrete + steel Equipment Structure is ______?

Fixed

Pinned

Enforced But

Free

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Around heat exchangers, which of the following is TRUE?

Side portion should be open space (no flooring)

Overhead clearance around Heat Exchangers shall be 2.9m

Handrail installed in front of the heat exchanger shall be removable type

Flooring around heat exchanger shall be checkered plate

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the overhead clearance for personnel access in this project?

1.8 m

2.1 m

2.4 m

2.9 m

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the minimum access width for ladder landing and personnel access?

0.75 m

0.76 m

0.80 m

1.0 m

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?