Philippine Electrical Code (Subject 4) - Nth

Philippine Electrical Code (Subject 4) - Nth

University

50 Qs

quiz-placeholder

Similar activities

Quiz no. 1- Process Management & Concurrent Processes

Quiz no. 1- Process Management & Concurrent Processes

University

55 Qs

PRELIM EXAM GEd 102 Readings in Phil History

PRELIM EXAM GEd 102 Readings in Phil History

University

50 Qs

GK- Marathon 13,14 & 15

GK- Marathon 13,14 & 15

8th Grade - Professional Development

50 Qs

ANTENNA

ANTENNA

University

45 Qs

Aptitude Test 9 (10th July 2021)

Aptitude Test 9 (10th July 2021)

University

46 Qs

OOP Midterms

OOP Midterms

University

50 Qs

UTS Embedded System Programming

UTS Embedded System Programming

University

50 Qs

Part 2 Final Examination AnaPhy

Part 2 Final Examination AnaPhy

University

50 Qs

Philippine Electrical Code (Subject 4) - Nth

Philippine Electrical Code (Subject 4) - Nth

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

Norlan Hiponia

Used 32+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The overhead conductors, through which electrical service is supplied, between the last power company pole and the building or other support used for the purpose are called:

Service entrance

Service-entrance conductors

Service drop

Service-entrance equipment

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. The conductors and equipment for delivering electric energy from the power company to the wiring system of the premises served is called a:

Service

Service-entrance conductors

Service drop

Service-entrance equipment

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. The conductors between the point of termination of the overhead service drop or underground service lateral and the main disconnecting device in a building are known as:

Service

Service conductors

Service drop

Service-entrance equipment

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. The necessary equipment connected to the load end of the service conductors to a building or other structure and intended to constitute the main control and cutoff of the supply is known as:

Service entrance

Service-entrance conductors

Service drop

Service equipment

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. The underground conductors through which service is supplied between the power company’s distribution facilities and the first point of their connection to a building or area service facilities located at the building or other support used for the purpose are known as:

Service clearance

Service lateral

Parallel connection

Weatherhead

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. In a balanced three-phase, 4-wire system, the current in the neutral conductor:

Is the same as in the other conductors

Is lower than in the other conductors

Is higher than in the other conductors

Will not flow when all loads are exactly balanced

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. On a 240-volt, single-phase, 3-wire system, the neutral conductor will:

Never carry current even if the other conductors carry current

Never carry current larger than the difference between the current in the two ungrounded (“hot”) conductors

Carry current equal to the current between phases

Carry current equal to one-half the current between phases

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?