Chapter 15 2021 UPC

Chapter 15 2021 UPC

28 Qs

quiz-placeholder

Similar activities

Grounding and Bonding

Grounding and Bonding

KG - University

23 Qs

Sound Review

Sound Review

8th Grade

26 Qs

Ch. 12 Freshwater Resources - (R)

Ch. 12 Freshwater Resources - (R)

6th Grade

29 Qs

WELDING SAFETY (warmup game)

WELDING SAFETY (warmup game)

11th Grade

24 Qs

Content Statements 6, 5 Quiz

Content Statements 6, 5 Quiz

11th Grade

25 Qs

7th gr Unit 1, Lesson 6, 7, 8, and 9 voc quiz

7th gr Unit 1, Lesson 6, 7, 8, and 9 voc quiz

7th Grade

23 Qs

Chapter 15 2021 UPC

Chapter 15 2021 UPC

Assessment

Quiz

others

Medium

Created by

Jeremy Sandor

Used 65+ times

FREE Resource

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The provisions of______________shall apply to the construction, alteration, and repair of alternate water source systems for non potable applications.
a. this chapter
b. the authority having jurisdiction
c. this chapter and the Washington State Department of health
d. the Washington State Department of health

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. Gray water installations having a minimum discharge capacity of ______ gallons per day shall be designed by a registered design professional.

a. 150
b. 175
c. 200
d. 250

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. Each room containing on-site treated water equipment shall have a sign posted with _____ inch letters.
a. 1/4”
b. 1/2”
c. 3/4”
d. 1”

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. Cross-connection inspection and testing on both potable and reclaimed water systems shall be performed ____.
a. initially
b. annually
c. semi-annually
d. initially and annually

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. Upon discovery of a cross connection, the potable water system shall be chlorinated with ____ parts per million.
a. 50
b. 75
c. 100
d. 110

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Reclaimed water pipes shall be permitted to be run in the same trench as potable water pipes with a _____ inch minimum vertical and horizontal separation where both pipe materials are approved for use within a building.
a. 6
b. 12
c. 18
d. 24

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. On-site treated non potable water piping sizing shall comply with ______.
a. table 610.3
b. table 702.1
c. chapter 6
d. chapter 7

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?