
Line Clearance
Authored by Agnes Wong
Professional Development
Professional Development
Used 10+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is line clearance?
A process where the temperature and humidity are out of spec
A process of emptying out whole system and perform super dry clean
A process of emptying out the system and segregating Finished Goods pallets
A process where the raws & packs from previous SKU are removed before changing to new SKU
Answer explanation
Line clearance is a process performed by all areas at SKU Change.
Refer to SOP-0196 Line Clearance at SKU Change and Form PD0188 for more details.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is line clearance important?
To ensure the APF3 blends packed into APF4 cans.
To ensure all sources of food safety risks are controlled when moving from one SKU to another
To ensure we do not introduce micro contamination into our products when changing SKU to another
To ensure the system and line are clean before producing finished products for babies
Answer explanation
(e.g. cross contamination, packing product into incorrect packaging etc)
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many recalls in ANZ from 2012 - 2021 that could potentially relate to line clearance not being done properly?
274
519
188
386
Answer explanation
There were 386 recalls for undeclared allergen, packaging fault & incorrect product labelling, a lot of which have happened due to insufficient line clearance.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many quality incidents in Danone are linked to line clearance issues?
17
38
59
6
5.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What are the examples below could be due to line clearance process not being followed?
APN1 powder in blending system packed into APN4 cans
EB micro detection on Finished Product
Lab testing for sheep DNA on first blend was out of spec
Toptainer for Essensis S4 loaded for a Essensis S2 run
6.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
When do we perform line clearance?
During PO change
During SKU change
Whenever we like
Quality & Food Safety issues per SM / 2IC informed
Answer explanation
Under normal process, line clearance is performed during SKU change.
There are situations involved quality incidents that SM / 2IC will inform to perform line clearance.
7.
REORDER QUESTION
1 min • 5 pts
What is the sequence of line clearance?
Palletiser
Depal & Canline
MC Packing & Pack Hall
Dispensing / Tipping
RM Loading & Debagging
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
AWS Amazon VPC
Quiz
•
Professional Development
10 questions
Activism : Be Seen Be Heard
Quiz
•
Professional Development
15 questions
ENGLISH GRAMMAR
Quiz
•
5th Grade - Professio...
15 questions
5S Concepts Quiz
Quiz
•
Professional Development
15 questions
Accepting Change Quiz
Quiz
•
Professional Development
15 questions
Breakthrough Performance
Quiz
•
Professional Development
10 questions
Incoterm 2020
Quiz
•
Professional Development
15 questions
Workforce Analyst Assessment
Quiz
•
Professional Development
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
20 questions
Figurative Language Review
Quiz
•
6th Grade