State Test 04

State Test 04

Professional Development

93 Qs

quiz-placeholder

Similar activities

Mobile Device Management Quiz

Mobile Device Management Quiz

Professional Development

92 Qs

TO Teknis Administrasi Perkantoran TY

TO Teknis Administrasi Perkantoran TY

Professional Development

90 Qs

puser

puser

Professional Development

90 Qs

Accounts Payable Cloud

Accounts Payable Cloud

Professional Development

95 Qs

Quiz on Arbitration and Mediation

Quiz on Arbitration and Mediation

Professional Development

92 Qs

Internet Technology Final -Revision from ch-5 to ch-9

Internet Technology Final -Revision from ch-5 to ch-9

Professional Development

88 Qs

CPL Nav Mega Quiz Part 1

CPL Nav Mega Quiz Part 1

Professional Development

96 Qs

State Test 04

State Test 04

Assessment

Quiz

Other

Professional Development

Easy

Created by

Johnny Thulin

Used 4+ times

FREE Resource

93 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Acid-resisting trap is installed underground, such trap shall be embedded in concrete extending _" beyond the trap.
2
3
4
6

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The maximum retention time for untreated gray water in a collection reservoir is __________ hours.
24
48
36
72

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Hose bibbs require protection from backflow by a(n) __________.
Air gap
Vacuum breaker
Reduced pressure principle backflow preventer
Double check valve

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

All horizontal drains shall have cleanouts located no more than __________ feet apart.
40
60
80
100

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Individual and branch vent pipes over 40 feet long require __________.
not less than 2 inches in diameter
one-half the diameter of the drain served
not less than 2 pipe sizes smaller than the largest drain served
pipe size greater than otherwise required

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

"Test reports required as evidence of code compliance shall be retained for __________.
180 days after completion of the project
the period required for retention of public records
90 days after completion of the project
120 days after occupancy of the building

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The maximum developed length of a 11/4-inch vent pipe for a 40 gpm sewage ejector pump is __________ feet.
unlimited
40
72
d. 160

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?