Acid-resisting trap is installed underground, such trap shall be embedded in concrete extending _" beyond the trap.
2
3
4
6
2.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
The maximum retention time for untreated gray water in a collection reservoir is __________ hours.
24
48
36
72
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Hose bibbs require protection from backflow by a(n) __________.
Air gap
Vacuum breaker
Reduced pressure principle backflow preventer
Double check valve
4.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
All horizontal drains shall have cleanouts located no more than __________ feet apart.
40
60
80
100
5.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Individual and branch vent pipes over 40 feet long require __________.
not less than 2 inches in diameter
one-half the diameter of the drain served
not less than 2 pipe sizes smaller than the largest drain served
pipe size greater than otherwise required
6.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
"Test reports required as evidence of code compliance shall be retained for __________.
180 days after completion of the project
the period required for retention of public records
90 days after completion of the project
120 days after occupancy of the building
7.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
The maximum developed length of a 11/4-inch vent pipe for a 40 gpm sewage ejector pump is __________ feet.
unlimited
40
72
d. 160
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?