FORUM CRITICAL EQUIPMENT MANAGEMENT AND MAINTENANCE STRATEGY & APPROACH

FORUM CRITICAL EQUIPMENT MANAGEMENT AND MAINTENANCE STRATEGY & APPROACH

Professional Development

10 Qs

quiz-placeholder

Similar activities

Task 4 Ground Source Heat Pump Systems Quiz

Task 4 Ground Source Heat Pump Systems Quiz

Professional Development

9 Qs

EXAMEN PARCIAL DE DISEÑO DE VIDEO JUEGOS

EXAMEN PARCIAL DE DISEÑO DE VIDEO JUEGOS

Professional Development

10 Qs

Universal Design for Learning (UDL) Guidelines Quiz

Universal Design for Learning (UDL) Guidelines Quiz

Professional Development

10 Qs

[SME18] ASSESSMENT 7-STEP PROBLEM SOLVING

[SME18] ASSESSMENT 7-STEP PROBLEM SOLVING

Professional Development

10 Qs

HSSE CHALLENGE

HSSE CHALLENGE

Professional Development

14 Qs

Grapevine Fire Department Standard Automatic Fire Alarm Quiz

Grapevine Fire Department Standard Automatic Fire Alarm Quiz

Professional Development

5 Qs

Pre-Test Data Governance, Data Quality, Policy-Standard

Pre-Test Data Governance, Data Quality, Policy-Standard

Professional Development

15 Qs

EdPE302

EdPE302

Professional Development

5 Qs

FORUM CRITICAL EQUIPMENT MANAGEMENT AND MAINTENANCE STRATEGY & APPROACH

FORUM CRITICAL EQUIPMENT MANAGEMENT AND MAINTENANCE STRATEGY & APPROACH

Assessment

Quiz

others

Professional Development

Medium

Created by

generation academy

Used 24+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. There are three (3) importance of Critical Equipment Strategy in the power plant. Please choose the incorrect answer.
To maximize availability and reliability
To minimize total maintenance cost
To increase energy efficiency
To create robustness of the equipment and reduce risk of failure

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. What is AMPG?
Asset Management Program Guideline
Asset Major Planned Guideline
Asset Maintenance Philosophy Guideline
Asset Management Philosophy Guideline

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. The system prioritization assessment shall be carried out for each system before proceed with the Critical Equipment Assessment. What are the components of the System Prioritization?
Consequence (X) Probability
Criticality (X) Consequence
Probability (X) Criticality
Effect (X) Probability

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. How to improve detectability towards the equipment failure?

i. Time / Usage based monitoring

ii. Standardized repair procedure

iii. Condition based monitoring

iv. Regular inspection

i, ii and iv

i, ii & iii

i, iii & iv

ii, iii and iv

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. What is the process involved in Asset Lifecycle Management Process? Please choose the correct step.
Acquire Asset -Operation & Maintenance
Acquire Asset - Operation & Maintenance - Replace/Dispose
Operation & Maintenance - Replace/Dispose
Operation & Maintenance - Acquire Asset - Replace/Dispose

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Below are the preventive maintenance strategies EXCEPT

Condition-based maintenance
Usage-based maintenance
Breakdown maintenance
Time-based maintenance

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. What type of maintenance strategy approach is appropriate for a short repair or changes in time?
Breakdown maintenance
Time-based maintenance
Condition-based maintenance
Usage-based maintenance

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?