1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An Activity Measure is...

a type of duration driver used in activity-based costing systems.

an allocation base in an activity-based costing system.

an event that causes the consumption of overhead resources.

a "bucket" in which costs are accumulated in an activity-based costing system.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Relying exclusively on unit-level overhead allocation is most likely to:

Overcost all Products

Undercost all Products

Overcost Low-Volume Products

Overcost High-Volume Products

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is true regarding Organization-Sustaining Activity Costs?

Organization-sustaining activity costs should be allocated to products using an organization-level activity measure.

Organization-sustaining activity costs should be allocated to products using a batch-level activity measure.

Organization-sustaining activity costs should be allocated to products using a product-level activity measure.

Organization-sustaining activity costs should not be allocated to products.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Two Common types of Activity Measures are...

Time Driver and Money Driver

Transaction Driver and Duration Driver

Length Driver and Utility Driver

Cost Driver and Unit Driver

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Media Image

What is the capacity used in minutes?

955,000

1,055,000

1,155,000

1,255,000

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Media Image

If the company uses number of setup hours as the activity measure, what is the activity rate for machine setups?

$100

$150

$200

$250

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Media Image

How much total activity cost would be assigned to Customer A from the company's three activities?

$2275

$2864

$1835

$1575

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?