
Domestic Hot Water 6035-02 | Part 6
Authored by George Harding
Professional Development
Professional Development
Used 83+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
40 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
STATEMENT: The hot water distribution should be level from the cylinder and should be at least 450mm long before the vent pipe connection.
True
False
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
STATEMENT: A solid fuel boiler has an easier temperature control than those of gas and electric.
True
False
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where would you find the component shown here?
F&E cistern
Inlet to combi boiler
Primary return pipe
CWSC open vent
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following are safety measures to prevent water exceeding 100°C?
Expansion vessel
Cylinder thermostat
PRV/TPRV
All of the above
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which pipe connects from the CWSC to the hot water cylinder?
Cold feed
Cold distribution
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a type of fuel source?
Natural gas
LPG
Solid fuel
All of the above
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During soundness test A, what pressure is the pipework tested at for 15 minutes?
The exact working pressure
1/3 of working pressure
1.5 times the working pressure
4 times the working pressure
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?