Basic Maintenance MPA

Basic Maintenance MPA

10th Grade

•

50 Qs

quiz-placeholder

Similar activities

Financial Planning Test Review

Financial Planning Test Review

9th - 12th Grade

•

46 Qs

Third Summative Test

Third Summative Test

10th Grade

•

50 Qs

Quiz Layanan Bisnis

Quiz Layanan Bisnis

10th Grade

•

45 Qs

Penilaian Tengah Semester 2 Kelas 10

Penilaian Tengah Semester 2 Kelas 10

10th Grade

•

45 Qs

Health Support Services Final Review

Health Support Services Final Review

9th Grade - Professional Development

•

55 Qs

TLE 10 Illustration

TLE 10 Illustration

10th Grade

•

50 Qs

dasar dasar otomotif kelas x

dasar dasar otomotif kelas x

10th Grade

•

55 Qs

SAS DASAR-DASAR TEKNIK OTOMOTIF

SAS DASAR-DASAR TEKNIK OTOMOTIF

10th Grade - University

•

50 Qs

Basic Maintenance MPA

Basic Maintenance MPA

Assessment

Quiz

•

Education

•

10th Grade

•

Practice Problem

•

Easy

Created by

Agung Wibowo

Used 39+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tujuan dari kegiatan maintenance,kecuali?

High availability

Best Performance

Reduce repaire cost

High Repaire cost

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Kondisi unit dimna unit itu siap digunakan kapanpun,dimanapun pukul berapapun itu arti dari tujuan maintenance dari?

High availability

Best Performance

Reduce repaire cost

Physical availability

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PC 1250 - 8 mampu digging sesuai dengan spesifikasi pabrikan,ini adalah salah satu tujuan dari maintenance yang?

High availability

Best performance

Reduce repaire cost

High quality

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

biaya perawatan bisa disesuaikan dengan kebutuhan service dan bahkan bisa di efisienkan sesuai dengan kondisi di lapangan,ini adalah salah satu tujuan maintenance yang..?

High availability

Best performance

Reduce repaire cost

Reduce fuel consumtion

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pengambilan sampling PAP dilakukan setiap HM berpa?sesuai dengan anjuran OMM

250 HM

125 HM

500 HM

750 HM

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Penggantian oli Engine untuk unit yang sesuai dengan OMM komatsu disetiap....?

125 HM

250 HM

500 HM

1000 HM

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Jenis perawatan yang bertujuan untuk mengembalikan kondisi unit mendekati seperti semula,disebut?

Condition base maintenance

Schedule overhaul

Repaire and adjustment

Breakdown maintenance

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?