PPPM

PPPM

University

7 Qs

quiz-placeholder

Similar activities

Visual Basic

Visual Basic

University

10 Qs

unit 1- Construction Materials-Introduction

unit 1- Construction Materials-Introduction

University

10 Qs

Reviewer

Reviewer

University

10 Qs

Contract Grading

Contract Grading

University

10 Qs

BEM_UNIT 3_TECHNICAL SUPPORT

BEM_UNIT 3_TECHNICAL SUPPORT

University

8 Qs

Trend

Trend

University

10 Qs

PBL day 2025

PBL day 2025

University

10 Qs

HVE-|Q3|High voltage Insulation materials|

HVE-|Q3|High voltage Insulation materials|

University - Professional Development

5 Qs

PPPM

PPPM

Assessment

Quiz

Education

University

Easy

Created by

Pearl Oruamabo

Used 2+ times

FREE Resource

7 questions

Show all answers

1.

OPEN ENDED QUESTION

5 mins • 1 pt

Name 3 types of project schedule logical dependencies.

Evaluate responses using AI:

OFF

Answer explanation

Logical dependencies finish-to start(with lag/lead)/start-to-start (with lag)/finish-to-finish (with lag)/start-to-finish

2.

OPEN ENDED QUESTION

3 mins • 1 pt

Who should be responsible for a stage/gate review?

Evaluate responses using AI:

OFF

Answer explanation

This should be the Sponsor/SRO

3.

OPEN ENDED QUESTION

3 mins • 1 pt

Name 3 methods of estimating project costs and timescales.

Evaluate responses using AI:

OFF

4.

OPEN ENDED QUESTION

3 mins • 1 pt

Name 3 different types of project life cycle

Evaluate responses using AI:

OFF

5.

OPEN ENDED QUESTION

3 mins • 1 pt

Name 4 project breakdown structures.

Evaluate responses using AI:

OFF

6.

OPEN ENDED QUESTION

3 mins • 1 pt

Which 2 of the breakdown structures are used to define the project’s scope?

Evaluate responses using AI:

OFF

7.

OPEN ENDED QUESTION

3 mins • 1 pt

Which 2 of the breakdown structures are used to construct a responsibility assignment matrix or RAM/RA(S)CI?

Evaluate responses using AI:

OFF