Plant design questions

Plant design questions

University

34 Qs

quiz-placeholder

Similar activities

Introduction to Stats

Introduction to Stats

12th Grade - University

35 Qs

Blood and Cardiovascular System Quiz

Blood and Cardiovascular System Quiz

University

30 Qs

Med surg ch 26 patients with heart failure

Med surg ch 26 patients with heart failure

University

38 Qs

MID 2 AT

MID 2 AT

University

30 Qs

BE Quiz 1

BE Quiz 1

KG - Professional Development

30 Qs

IMESC Quiz (Mathematics)

IMESC Quiz (Mathematics)

University

30 Qs

Heat Treatment in Metals Quiz

Heat Treatment in Metals Quiz

University

33 Qs

Grade 7 End-of-Year Test

Grade 7 End-of-Year Test

7th Grade - University

30 Qs

Plant design questions

Plant design questions

Assessment

Quiz

Mathematics

University

Hard

Created by

Mina George

Used 1+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The given figure, graph the relation between piping costing versus pipe diameter. Then the curve (A) may represente ...............

Pumping Power

Fixed charges based on capital investment

Pipe material of construction

Cost of pipeline maintenance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

In the given figure the cost of pumping power decreases as pipe diameter increase due to ...........

Decrease of frictional effect

Increase of flow rate

Decrease of flow rates

Decrease in the raw material cost

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which stages of plant design stages must be conducted before analysis: Which is a rough estimation in order to determine if the idea of the alternative methods is technically accepted or not to produce the desired product

Recognition of social need or an economic opportunity

Conception of one or more ideas to produce the desired product

Detailed design of the process flow sheet

Construction and start-up

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The design process based on approximate process methods, and rough cost estimates are prepared. Few details are included, and the time spent on calculations is kept at a minimum.

Preliminary or quick-estimate designs

Detailed-estimate designs

Firm process designs

Optimum estimated design

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In this type of design, the costand- profit potential of an established process is determined by detailed analyses and calculations.

Preliminary or quick-estimate designs

Detailed-estimate designs

Firm process designs

Optimum estimated design

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

For Helwan Iron and Steel Factory in 1954, from the items that should be considered in making a feasibility survey (which have major priority - more than one correct answer)

Availability of raw material

Competition (comparison of various manufacturing

processes)

Markets (present and future supply and demand)

Safety considerations

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

A chemical industry that deals with highly toxic material which factors from the following will have major priority within study (more than one correct answer)

Availability of raw material

Competition (comparison of various manufacturing

processes)

Markets (transportation of raw material and products)

Safety considerations

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?