2021 Practice Test #6

2021 Practice Test #6

Professional Development

100 Qs

quiz-placeholder

Similar activities

Big Test Dude Part 3

Big Test Dude Part 3

Professional Development

99 Qs

Subdivision and Housing Regulations

Subdivision and Housing Regulations

Professional Development

100 Qs

Med Term Chpt 12 The Eye

Med Term Chpt 12 The Eye

Professional Development

95 Qs

Health and Safety

Health and Safety

Professional Development

100 Qs

PK PC1250-8

PK PC1250-8

Professional Development

100 Qs

Coronal Polish 100 Questions

Coronal Polish 100 Questions

Professional Development

100 Qs

Post Test : Preparation COA Feed/H2 Dryer & CGB

Post Test : Preparation COA Feed/H2 Dryer & CGB

Professional Development

100 Qs

2021 Practice Test #6

2021 Practice Test #6

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Mike Sommerfeldt

Used 15+ times

FREE Resource

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is the initial pressure test done by a Medical Gas Installer, on a nitrous oxide system?

After blow down of the distribution piping

After installation of alarm sensors

Before blow down of the distribution piping

Before installation of rough-in assemblies

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In those portions systems intended to handle oxygen at pressures greater than 350 psi, the interconnecting hose shall NOT contain ______________ materials.

brass

copper

polymeric

stainless steel

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a Category 1 Dental and Gas Vacuum piping system, which of the following is an NFPA 99 requirement for the labeling of pipes?

Color coding and pressure requirements of Table 5.1.11

Fixed label width

Label shall wrap completely around the pipe

Reflective label

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is permitted to be installed to isolate or shut off piping, for servicing of individual rooms or areas?

In-line shutoff valve

Main line valve

Source valve

Zone Valve

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following treatments shall be performed before brazing cut ends of a tube, to be installed in a medical gas piping system?

An argon purge shall be performed

Cut ends shall be rolled smooth or deburred

Extensions shall be added for brazing

Treatment is NOT required; they may be brazed as is

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manifolds for gas cylinders shall actuate a(n) __________ signal and shall activate an indicator at all __________ alarm panels to indicate when or just before changeover from one header to another.

area, master

local, master

master, local

master, area

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a non-anesthetizing area, on which side of the zone valve shall the pressure/vacuum sensor be located?

Station outlet/inlet side

Source side

Upstream side

NFPA 99 does NOT specify a requirement

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?