ISTQB Question Bank 501 to 540

ISTQB Question Bank 501 to 540

Professional Development

40 Qs

quiz-placeholder

Similar activities

Exam - 2 more AA recall pratice

Exam - 2 more AA recall pratice

Professional Development

35 Qs

Neuro

Neuro

Professional Development

35 Qs

BMC Laboratorio de BMC

BMC Laboratorio de BMC

Professional Development

35 Qs

Anatomi Oral II T2SII set B

Anatomi Oral II T2SII set B

Professional Development

40 Qs

The Human Body

The Human Body

4th Grade - Professional Development

42 Qs

Unit 5 Cell Cycle CR (BIOLOGY)

Unit 5 Cell Cycle CR (BIOLOGY)

Professional Development

40 Qs

CSET II

CSET II

Professional Development

42 Qs

UAS PMSM XI TBSM

UAS PMSM XI TBSM

Professional Development

40 Qs

ISTQB Question Bank 501 to 540

ISTQB Question Bank 501 to 540

Assessment

Quiz

Science

Professional Development

Practice Problem

Easy

Created by

Hiếu Bồ

Used 11+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following statements is MOST OFTEN true?

Source-code inspections are often used in component testing.
Component testing searches for defects in programs that are separately testable.
Component testing is an important part of user acceptance testing.
Component testing aims to expose problems in the interactions between software and hardware components.

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following is an objective of a pilot project for the introduction of a testing tool?

Evaluate testers' competence to use the tool.
Complete the testing of a key project.
Assess whether the benefits will be achieved at reasonable cost.
Discover what the requirements for the tool are.

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is an informal test design technique where a tester uses information gained while testing to design new and better tests?

Error guessing
Exploratory testing
Use case testing
Decision table testing

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following is determined by the level of product risk identified?

Extent of testing.
Scope for the use of test automation.
Size of the test team.
Requirement for regression testing.

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

When should testing be stopped?

When all the planned tests have been run
When time has run out
When all faults have been fixed correctly
It depends on the risks for the system being tested

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of following statements is true? Select ALL correct options Regression testing should be performed:

<br>

i Once a month

ii When a defect has been fixed

iii When the test environment has changed

iv When the software has changed

ii and iv.

ii, iii and iv.

i, ii and iii.

i and iii.

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The following statements are used to describe the basis for creating test cases using either black or white box techniques:

<br>

i Information about how the software is constructed.

ii Models of the system, software or components.

iii Analysis of the test basis documentation.

iv Analysis of the internal structure of the components.

<br>

Which combination of the statements describes the basis for black box techniques?

ii and iii.

ii and iv.

i and iv.

i and iii.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?