1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved.

Your FIRST preferred course of action is to:

Consult your supervisor

Verbally challenge the NCR

Review the NCR with the other Inspector

Request a re-blast of the item in question

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

You are the NACE Coating Inspector on a tank lining project and are asked to perform a high voltage holiday test after the coating applicators have completed their final repairs. After meeting all the confined space entry permit you enter the tank and notice a very strong odor of solvent.

Your first course of action should to:

Exit the tank and immediately and report the problem to the nearest safety supervisor

Exit the tank and document the incident in your daily report

Don your air supplied respirator and continue the testing

Investigate to find the source of the odor

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The Inspectors' goal at the Pre-Job Conference is to:

Discuss contractual requirements

Manage the meeting so it doesn't go off topic

Take accurate meeting minutes for distribution

Obtain a clear understanding of the Specification

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Individuals conducting Coating Surveys should:

Always be NACE or SSPC Protective coating Specialists

Always be trained and experienced Coating Industry

Always be NACE Level 3 Certified Inspectors

Always be experienced Specification Writers

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

You are a NACE Level 2 Coating Inspector who has just arrived on a job in progress where there is no Inspection and Test Plan (ITP). The first morning you arrive the job is behind schedule and you are asked to take DIY Film Thickness readings.

Your FIRST preferred course of action is to:

Call your supervisor

Refuse to take readings until an is in place

Develop your own methodology and proceed take the readings

Use a generally accepted industry standard and to take readings

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.

As this is not part of the standard you should:

Request clarification from the specifier

Enforce the additional requirement

Ignore the additional requirement

Call your supervisor

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In the event of a conflict between the Product Data Sheet and the Specification:

The Specification prevails

The Product Data Sheet prevails

It is up to the Inspector to decide which one to follow

It is up to the Applicator to decide which one to follow

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?