Linear Day 2 STAAR Blitz

Linear Day 2 STAAR Blitz

9th - 12th Grade

10 Qs

quiz-placeholder

Similar activities

Proporcionalnost

Proporcionalnost

9th Grade

10 Qs

5.1 Inverse & Direct Variation

5.1 Inverse & Direct Variation

9th - 12th Grade

12 Qs

Statistika

Statistika

12th Grade

10 Qs

Multiplicación

Multiplicación

1st - 10th Grade

10 Qs

PENILAIAN HARIAN - DIMENSI TIGA (KONSEP JARAK)

PENILAIAN HARIAN - DIMENSI TIGA (KONSEP JARAK)

12th Grade

10 Qs

Entrenamiento Preicfes Sesión 1 Razonamiento cuantitativo

Entrenamiento Preicfes Sesión 1 Razonamiento cuantitativo

11th Grade

10 Qs

Números Racionales Parte II

Números Racionales Parte II

8th - 9th Grade

10 Qs

Let's Mutiply!

Let's Mutiply!

9th Grade

6 Qs

Linear Day 2 STAAR Blitz

Linear Day 2 STAAR Blitz

Assessment

Quiz

Mathematics

9th - 12th Grade

Practice Problem

Medium

CCSS
8.EE.C.8B, HSF-LE.A.1B, HSF.IF.B.4

+1

Standards-aligned

Created by

Miguel Andrade

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

F

G

H

J

Tags

CCSS.8.EE.C.8B

CCSS.HSA.REI.C.6

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The graph of a linear function is shown on the graph.

What is the rate of change of y with respect to x for this function?

7/9

-7/9

3/4

-3/4

Tags

CCSS.HSF-LE.A.1B

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

A contractor's total earnings from a job include a fixed amount plus an amount based on the number of hours worked. The value in the table represents the linear relationship between the number of hours worked and the contractor's total earnings in dollars.

What is the rate of change of the contractor's total earnings in dollars with respect to the number of hours worked?

$8.75 per hours worked

$9.25 per hours worked

$10.00 per hours worked

$20.00 per hours worked

Tags

CCSS.HSF.IF.B.4

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statement base represents the equation of the line shown on the grid and its relationship to the x-axis?

The equation of the line is x = 2.5, and the line is parallel to the x-axis.

The equation of the line is x = 2.5, and the line is perpendicular to the x-axis.

The equation of the line is y = 2.5, and the line is parallel to the x-axis.

The equation of the line is x = 2.5, and the line is perpendicular to the x-axis.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the solution to this equation?

-4 (2m - 7) = 3 (52 - 4m)

32

46

-6.4

-40.75

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The graphs of lines k1 and k2 are shown on the grid.

Which systems of equations is best represented by this graph.

y = 3x - 2

y = -4/9x + 4

y = 3x - 6

y = -4/9x + 4/9

y = 1/3x + 9

y = -9/4x + 9/4

y = -x + 10

y = -9/4x + 13/4

Tags

CCSS.8.EE.C.8B

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

y= 3x + 27

y= -1/2x + 8

y= 3x + 8

y= -1/2x + 27

y= -1/2x + 27

y= 3x + 8

y= -1/2x - 27

y= 3x + 8

Tags

CCSS.8.EE.C.8B

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?