Search Header Logo

ISTQB Question Bank 141 to 180

Authored by Hiếu Bồ

Science

Professional Development

Used 4+ times

ISTQB Question Bank 141 to 180
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

A formal assessment of a work product conducted by one or more qualified independent reviewer to detect defects.

Inspection
Walkthrough
Review
Non Conformance

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which  of the  following  are  MAJOR  test  implementation  and  execution  tasks?

<br>

I. Repeating test activities

II. Creating test suites

III. Reporting discrepancies

IV. Logging the outcome

V. Analyzing lessons learned

II, III and IV

I, III, IV and V

I, II, III and IV

III, IV and V

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which  tasks  are  performed  by  a  test  leader  versus  a  tester?

<br>

S. Writing a project test strategy

T. Selecting tools to support testing

U. Preparing and acquiring data

V. Scheduling tests

Test leader: S and V; Tester: T and U

Test leader: S, T and V; Tester: U

Test leader: S, U and V; Tester: T

Test leader: S; Tester: T, U and V

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What type of tools to be used for Regression Testing

Performance
Record/Playback
A. & B.
None

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

System Integration testing should be done after

Integration testing
System testing
Unit testing
Component integration testing

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

During this event the entire system is tested to verify that all functional information structural and quality requirements have been met. A predetermined combination of tests is designed that when executed successfully satisfy management that the system meets specifications

Validation Testing
Integration Testing
User Acceptance Testing
System Testing

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the normal order of activities in which software testing is organized?

Unit, integration, system, validation
System, integration, unit, validation
Unit, integration, validation, system
None of the above

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?