PEC 5

PEC 5

University

49 Qs

quiz-placeholder

Similar activities

Structural NSCP Standards

Structural NSCP Standards

University

50 Qs

Structural NSCP Quiz

Structural NSCP Quiz

University

50 Qs

Philippine Electrical Code (Subject 5) - Nth

Philippine Electrical Code (Subject 5) - Nth

University

50 Qs

Registered Master Electrician's Exam

Registered Master Electrician's Exam

University

44 Qs

Philippine Electrical Code (Subject 6) - Nth

Philippine Electrical Code (Subject 6) - Nth

University

50 Qs

GEAS 30

GEAS 30

University

50 Qs

Electrical

Electrical

University

45 Qs

Philippine Electrical Code (Subject 7) - Nth

Philippine Electrical Code (Subject 7) - Nth

University

50 Qs

PEC 5

PEC 5

Assessment

Quiz

Other

University

Hard

Created by

Lira Ortega

FREE Resource

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Equipment for installation in hazardous locations must be tested and approved for use according to the classification of the hazards involved. These are divided into ______ groups.

4

3

7

6

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Compliance with the provisions of the PEC will result in ______.

I. freedom of hazards

II. good electrical service

III. an efficient system

I, II and III

I and II only

I only

II only

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Auxilliary gutters shall not contain more than ______ current carrying conductors at any cross section.

36

32

30

24

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

IN hazardous locations, the use of non-metallic conduit shall be permitted provided it is buried NOT less than ______ below the earth level.

400 mm

600 mm

1,000 mm

500 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Hazardous locations in which easily ignitable fibers or materials producing combustible flyings are handled, manufactured or used.

Class III, Division 1

Class III, Division 2

Class I, Division 1

Class I, Division 2

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are situations where deviations from the code requirements are necessary. Before such deviations are made, there must be a written permission from one of the following entities. Which one is this?

Board of Electrical Engineering

Code of Enforcing Authority

IIEE Code Committee

hilippine Regulation Board

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A point in a wiring system at which current is taken to be used in some equipment.

grounded

conductor

service entrance

outlet

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?