PEC 5

PEC 5

University

49 Qs

quiz-placeholder

Similar activities

Modern Times Part 1

Modern Times Part 1

9th Grade - University

50 Qs

Aptitude Test 10 (11th july 2021)

Aptitude Test 10 (11th july 2021)

University

47 Qs

Characters in the Bible

Characters in the Bible

3rd Grade - Professional Development

45 Qs

Rijbewijs B Les 1 tot Les 21

Rijbewijs B Les 1 tot Les 21

12th Grade - Professional Development

50 Qs

Games Hukes 2 April

Games Hukes 2 April

University

50 Qs

IAT-I ME8792 POWER PLANT ENGINEERING

IAT-I ME8792 POWER PLANT ENGINEERING

University

50 Qs

Journeyman 07 - Nth

Journeyman 07 - Nth

University

50 Qs

KMD TAHUN 2021

KMD TAHUN 2021

University

50 Qs

PEC 5

PEC 5

Assessment

Quiz

Other

University

Hard

Created by

Lira Ortega

FREE Resource

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Equipment for installation in hazardous locations must be tested and approved for use according to the classification of the hazards involved. These are divided into ______ groups.

4

3

7

6

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Compliance with the provisions of the PEC will result in ______.

I. freedom of hazards

II. good electrical service

III. an efficient system

I, II and III

I and II only

I only

II only

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Auxilliary gutters shall not contain more than ______ current carrying conductors at any cross section.

36

32

30

24

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

IN hazardous locations, the use of non-metallic conduit shall be permitted provided it is buried NOT less than ______ below the earth level.

400 mm

600 mm

1,000 mm

500 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Hazardous locations in which easily ignitable fibers or materials producing combustible flyings are handled, manufactured or used.

Class III, Division 1

Class III, Division 2

Class I, Division 1

Class I, Division 2

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are situations where deviations from the code requirements are necessary. Before such deviations are made, there must be a written permission from one of the following entities. Which one is this?

Board of Electrical Engineering

Code of Enforcing Authority

IIEE Code Committee

hilippine Regulation Board

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A point in a wiring system at which current is taken to be used in some equipment.

grounded

conductor

service entrance

outlet

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?