Cold Water Supply 1
Authored by Paul McGarrigle
Other
Professional Development
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
a. One tap, normally the kitchen sink, should be drawn directly from the supply pipe
a. One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
a. Mixer taps will require double check valves
a. Mixer taps should never be installed due to the pressure differences.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. According to BS6700 and the Water Regulations, a drain off valve should be installed:
a. At every draw off point
a. At every high point in the system
a. At every low point in the system
a. Above the cold water storage cistern.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. Pin holing in copper pipework is commonly caused by:
a. Hard water
a. Acidic water
a. Alkaline water
a. Pure water.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?
a. Place a warning label on every open end
a. Warn the customer not to interfere with any pipework
a. Be as quick as you can to return.
a. Cap off with a push fit fitting
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. One of the major problems when leaving a dead leg in a cold water pipe is:
a. Electrolytic corrosion
a. Pitting of pipework
a. Reduction in water flow
a. Possible bacterial growth.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. The use of WRAS approved fittings when installing cold water pipework is:
a. A legal requirement
a. To be corrosion resistant
a. To avoid contamination
a. All of the above.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?
a. Visual inspection with the customer
a. Flush the pipework out then hand over to the customer
a. Prepare the benchmark certificate
a. Hand over to the customer.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
Coffe Break
Quiz
•
Professional Development
10 questions
E6F Unit 5 - An Interim Solution
Quiz
•
Professional Development
10 questions
Ori and the will of the wisps
Quiz
•
KG - Professional Dev...
19 questions
Ergonomia
Quiz
•
Professional Development
15 questions
Quis BPJS
Quiz
•
Professional Development
13 questions
PowerPoint IMiL Quiz
Quiz
•
Professional Development
14 questions
Brawl Stars
Quiz
•
KG - Professional Dev...
10 questions
eOPE (Review)
Quiz
•
Professional Development
Popular Resources on Wayground
7 questions
History of Valentine's Day
Interactive video
•
4th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
15 questions
Valentine's Day Trivia
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
Discover more resources for Other
44 questions
Would you rather...
Quiz
•
Professional Development
20 questions
Black History Month Trivia Game #1
Quiz
•
Professional Development
12 questions
Mardi Gras Trivia
Quiz
•
Professional Development
14 questions
Valentine's Day Trivia!
Quiz
•
Professional Development
7 questions
Copy of G5_U5_L14_22-23
Lesson
•
KG - Professional Dev...
16 questions
Parallel, Perpendicular, and Intersecting Lines
Quiz
•
KG - Professional Dev...
11 questions
NFL Football logos
Quiz
•
KG - Professional Dev...
12 questions
Valentines Day Trivia
Quiz
•
Professional Development