unit 5  Program planning

unit 5 Program planning

University

7 Qs

quiz-placeholder

Similar activities

Total Physical Response

Total Physical Response

University

10 Qs

Mollusks

Mollusks

10th Grade - University

10 Qs

LESSON 4: MY ROOM

LESSON 4: MY ROOM

University

12 Qs

External Lab AMC-105

External Lab AMC-105

University

12 Qs

FRONT OFFICE OPERATIONS II

FRONT OFFICE OPERATIONS II

University

12 Qs

E-COMMERCE: MODERN PROBLEMS NEEDS MODERN SOLUTIONS

E-COMMERCE: MODERN PROBLEMS NEEDS MODERN SOLUTIONS

University

10 Qs

Trivia Challenge! Round 2

Trivia Challenge! Round 2

5th Grade - University

12 Qs

Beginning of the term quiz

Beginning of the term quiz

University

10 Qs

unit 5  Program planning

unit 5 Program planning

Assessment

Quiz

Education

University

Practice Problem

Hard

Created by

Karthikeyan S

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Remembering: What is the first step in program planning?

Writing G-Code
Setting up work holding
Determining cutting parameters
Creating a process flow chart

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Understanding: What is the purpose of creating a process flow chart?

To determine cutting parameters
To visualize the machining process
To write the G-Code
To set up work holding

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Applying: What information is included in the process flow chart?

Cutting parameters and tool path
Work holding and tool selection
G-Code and cutting parameters
Tool path and tool selection

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Analyzing: What is the importance of determining cutting parameters in program planning?

It affects tool path and material removal rate
It affects work holding and tool selection
It affects the final product quality
It affects the G-Code

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Evaluating: Which tool should be selected before determining cutting parameters?

The tool with the desired material removal rate
The tool with the desired tool path
The tool with the desired final product quality
Any tool

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Creating: How do you determine cutting parameters?

Based on the desired material removal rate
Based on the desired tool path
Based on the desired final product quality
Based on the G-Code

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Remembering: What is the final step in program planning?

Writing G-Code
Setting up work holding
Determining cutting parameters
Creating a process flow chart

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Education