Search Header Logo

Solar Panels

Authored by James Coupland

Other

Professional Development

Used 4+ times

Solar Panels
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In order to be UK Finance Lender Handbook compliant, what is the maximum Lease term for a Solar Panel Lease?

7 years

20 years

25 years

30 years

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select all that are required for a Solar Panel Lease to be UK Finance Lender compliant?

Lease term does not exceed 30 years

The lease allows for the necessary removal and

re-instatement of the equipment for essential roof repairs

The Lease contains a Lenders Break Right Clause

The equipment will be insured by the tenant (Solar Panel Provider) for the term of the Lease

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

How would a buyers Conveyancers be notified that the property is subject to a Solar Panel Lease? List all that apply.

Charges Register of the Official Copies

Google Earth or the Sales Particular

Contract

Section 4.6 of the SPIF (TA6)

Discussions with the buyer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Is Planning Permission required to install solar panels on the roof?

Always

No

Considered to be Permitted Development in most cases subject to certain conditions

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Is Building Regulations required for the installation of Solar Panels on the roof? Select all that apply

No

Yes. The ability of the existing roof to carry the load (weight) of the panels will need to be checked

Building Regulations will also apply to electrical installation

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Why is a Microgeneration Certificate Scheme (MCS) required for Solar Panels. Select all that apply

MCS sets various standards for installers and avoids the need to seek separate building regulation approval

You can not sell any surplus electricity generated to the National Grid without one

Its not required

Only required when the Solar Panels are Leased

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If Solar Panels are bought outright, how long would it take for the panels to become profitable?

0-5 years

5-15 years

10-20 years

Over 20 years

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?