GMJ 9189 Phase 1 Unit 302 A

GMJ 9189 Phase 1 Unit 302 A

Professional Development

24 Qs

quiz-placeholder

Similar activities

GMJ 6035 level 2 Cold Water No.1

GMJ 6035 level 2 Cold Water No.1

Professional Development

25 Qs

Retreat - Gallery Walk

Retreat - Gallery Walk

Professional Development

23 Qs

Phase 2 revision 2

Phase 2 revision 2

Professional Development

20 Qs

CHAPTER 5 – LENSES

CHAPTER 5 – LENSES

Professional Development

20 Qs

Joinery

Joinery

Professional Development

21 Qs

Gas Engineering Multiple Choice Questions

Gas Engineering Multiple Choice Questions

Professional Development

20 Qs

BS Discord Halloween Trivia

BS Discord Halloween Trivia

1st Grade - Professional Development

20 Qs

GMJ 6035 Hot water A

GMJ 6035 Hot water A

Professional Development

20 Qs

GMJ 9189 Phase 1 Unit 302 A

GMJ 9189 Phase 1 Unit 302 A

Assessment

Quiz

Other

Professional Development

Medium

Created by

Glen Johnson

Used 67+ times

FREE Resource

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where does prefabrication of pipework often take place?

When installing a bathroom

When replacing a kitchen sink

When there are lots of similar installations

When running pipework across a loft area

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When prefabricating pipework, what must be followed carefully?

The customer’s instructions

The installation drawing

The site plan

The works programme

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When cutting into existing pipework, which one of the following is not a consideration?

Isolate the water

Imperial to metric pipework

Clipping distance

Watertight joints

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should a sleeve be used?

When pipework passes through a masonry wall

When pipework passes through plasterboard

When pipework is under a floor

When pipework is vulnerable to frost

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is not the maximum depth for a notch in a wooden joist?

1/8th of the joist depth

0.125 of the joist depth

12.5% of the joist depth

80% of the joist depth

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The installation of pipework or carcass at an early stage of the build is known as ?

First fix

Second fix

Final fix

Airfix

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What does pipework insulation do?

Retains heat in the pipework

Protects copper pipe from insects

needlessly creates more cost for the customer

protects pipework from freezing

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?