1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where does prefabrication of pipework often take place?
When installing a bathroom
When replacing a kitchen sink
When there are lots of similar installations
When running pipework across a loft area
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When prefabricating pipework, what must be followed carefully?
The customer’s instructions
The installation drawing
The site plan
The works programme
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When cutting into existing pipework, which one of the following is not a consideration?
Isolate the water
Imperial to metric pipework
Clipping distance
Watertight joints
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When should a sleeve be used?
When pipework passes through a masonry wall
When pipework passes through plasterboard
When pipework is under a floor
When pipework is vulnerable to frost
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which is not the maximum depth for a notch in a wooden joist?
1/8th of the joist depth
0.125 of the joist depth
12.5% of the joist depth
80% of the joist depth
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The installation of pipework or carcass at an early stage of the build is known as ?
First fix
Second fix
Final fix
Airfix
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What does pipework insulation do?
Retains heat in the pipework
Protects copper pipe from insects
needlessly creates more cost for the customer
protects pipework from freezing
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?