Search Header Logo

Review for PDS

Authored by Douglas Thomas

Architecture

University

Used 3+ times

Review for PDS
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who takes the majority of risk in a traditional contract ?

Contractor

Client

Subcontractors

Architects

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who takes the risk for the design in a traditional project?

Client

Contractor

Superintendent

Financier

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which PDS provides a guaranteed price

Design and construct

Alliancing

Design bid build

Cost plus

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one disadvantage of the Design-bid-build delivery system?

Slow process

design uncertainty

tender cost uncertainty

quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one benefit of Design and construct project

Speed

Quality assurance

Safety guarantees

cost certainty at tender stage

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is in charge of the design post tender on a design and build project

Client

Architect during pretender concept design

National code of construction representative

Contractor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a major challenge of Design and construction project.

Quality of finished product

Controlling costs

Maintaining original design intent

All of these

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?