LOTO quiz
Authored by Toni Powell
Professional Development
Professional Development
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
7 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does LOTO mean?
Lakes of the Ozarks
Land of the Oneidas
Lockout/Tagout
Laughing on the Outside
2.
DRAG AND DROP QUESTION
1 min • 1 pt
LOTO is the (a) procedure to de-energize and (b) of equipment, machinery, etc. to prevent release of (c) energy during service, maintenance or relevant tasks that might result in (d) injury.
3.
MATCH QUESTION
1 min • 1 pt
HYDRAULIC
ELECTRICAL
PNEUMATIC
MECHANICAL
THERMAL
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When is LOTO required?
when the unexpected energization or start up of machines, equipment or prime movers could injure workers during cleaning, repairing, servicing, setting-up, adjusting and un-jamming.
when we need to control hazardous energy by use of locks and tags together to provide both a physical protection and a visual warning
To do service on a machine
when someone has been injured
5.
MATCH QUESTION
1 min • 1 pt
For use in the control of hazardous energy only.
MUST identify the person applying the lock.
Warn against hazardous conditions and identify the person applying the tag
use for reasons other than service, maintenance or cleaning tasks
For the use of isolating equipment that is not in use.
6.
REORDER QUESTION
1 min • 1 pt
What is the LOTO Procedure?
Machinery/equipment shutdown (normal shut down of the machine).
Notification of affected workers (in the work area prior to start).
Machinery/equipment isolation (isolate each of the hazardous energy sources).
Preparation for shutdown (identify hazardous energy sources, energy control equipment, shutdown procedures)
Energy control device application (apply locks, tags, and other energy control devices to secure the controls in the desired position).
7.
REORDER QUESTION
1 min • 1 pt
LOTO Procedures: Removal from Shut Down
Release from isolation (remove locks, tags, and other energy control devices used to control the energy sources and return the energy sources to the desired position)
Remove tools and equipment (from the equipment/machinery)
Notify affected workers (in the work area when work is completed)
Verify normal operations
Replace safeguards (e.g., guarding).
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
ESL Vocabulary: Technology 1
Quiz
•
University - Professi...
10 questions
INTO Artificial Intelligence
Quiz
•
University - Professi...
11 questions
Term 1 Reflection
Quiz
•
KG - Professional Dev...
12 questions
Communication and Sales by Vishal Jaiswal
Quiz
•
KG - Professional Dev...
10 questions
Linespersons Responsibilities Quiz: Icing
Quiz
•
Professional Development
10 questions
Business Networking Care 3 Topic 3.1
Quiz
•
Professional Development
10 questions
AXIE 101
Quiz
•
KG - Professional Dev...
10 questions
Prof Ed 6
Quiz
•
Professional Development
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
29 questions
Alg. 1 Section 5.1 Coordinate Plane
Quiz
•
9th Grade
22 questions
fractions
Quiz
•
3rd Grade
11 questions
FOREST Effective communication
Lesson
•
KG
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade