FINISHING 3

FINISHING 3

University

6 Qs

quiz-placeholder

Similar activities

F2 Quiz

F2 Quiz

University

10 Qs

Lathe machine spare parts

Lathe machine spare parts

11th Grade - University

10 Qs

Zero Hour

Zero Hour

University

10 Qs

Business Jargon Quiz

Business Jargon Quiz

University

10 Qs

Information-Processing Theory

Information-Processing Theory

University

10 Qs

Chapter 6: MRP (Part II: Drilling & Reaming)

Chapter 6: MRP (Part II: Drilling & Reaming)

University

10 Qs

CGE 577 - Quiz 1 (Deepwater Horizon Movie)

CGE 577 - Quiz 1 (Deepwater Horizon Movie)

University

10 Qs

Jan 2023 - Active Learning - DE1

Jan 2023 - Active Learning - DE1

University

11 Qs

FINISHING 3

FINISHING 3

Assessment

Quiz

Education

University

Medium

Created by

siti abait

Used 1+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.    What is the function of pilot drill?

a)    use to enlarge the hole

b)    use to make countersink

c)    use to make a center hole

d)    use to drill the actual hole

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.    What is the function of actual drill?

a)    use to enlarge the hole

b)    use to make countersink

c)    use to make a center hole

d)    use to drill the actual hole

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.    What is the purpose of countersink process?

a)    Countersink use to prepared the hole for rivet process

b)    Countersink use to enlarge the hole after drilling process

c)    Countersink function as finishing the surface of hole after drilling process.

d)    Countersink use to install screw, bolt etc and can be inserted flush with the surface.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.    What is the function of ream?

a)    use to enlarge the hole

b)    use to make countersink

c)    use to make a center hole

d)    use to drill the actual hole

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.    What is the function of jig in drilling process?

a)    Jig use as marking the hole before drilling process.

b)    To obtain safety to personel during drilling process.

c)    To reduce vibration on the panel during drilling process.

d)    To obtain positional accuracy, locate and guide drills and reamers of the holes.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.    What is the quickly inspection can be conducted after trimming process,?

                      i.        Tap test

                     ii.        Tensile test

                    iii.        Visual inspection

                   iv.        Dimensional Inspection

 

a)    i and ii

b)    ii and iii

c)    iii and iv

d)    i, iii and iv