2T331C

2T331C

Professional Development

78 Qs

quiz-placeholder

Similar activities

ACCENTURE MOCK TEST-1 SJIT ECE

ACCENTURE MOCK TEST-1 SJIT ECE

Professional Development

73 Qs

T LEVEL Health and Safety Legislation Quiz

T LEVEL Health and Safety Legislation Quiz

Professional Development

73 Qs

Embedded Systems Quiz 1

Embedded Systems Quiz 1

Professional Development

80 Qs

Przygotowanie do egzaminu AU.33 - Słówka ANG

Przygotowanie do egzaminu AU.33 - Słówka ANG

KG - Professional Development

82 Qs

Menchen A1 L1

Menchen A1 L1

Professional Development

83 Qs

My quiz

My quiz

Professional Development

73 Qs

bab 2 boyman

bab 2 boyman

Professional Development

80 Qs

org_str_2

org_str_2

Professional Development

79 Qs

2T331C

2T331C

Assessment

Quiz

Other

Professional Development

Practice Problem

Easy

Created by

Zachari Viebrock

Used 12+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

78 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

When hitching a trailer to a tow vehicle, the hazard point created is called

Shear

Wrap

Crush

Pinch

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

This kind of potential hazard point is associated with a chain, belt, or gear drive

Pinch

Wrap

Shear

Crush

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which action is taken if the rollover protective structure (ROPS) is damaged

Repair by welding

Reuse after repairing

Replace damaged ROPS

Bend damaged section back to normal

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Complete this action before returning a forklift to the field

Clean the forklift

Load test the forklift tines

Make sure it is functioning properly

Verify the forklift’s owning organization

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To support a forklift for maintenance

Use stacks of small blocks

Use hollow-tube block units

Blocks must be stacked until the forklift is level

Be sure the blocks are solid one piece units

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before removing major assemblies on forklifts, always

Consult with your supervisor

Get recommended procedures from your trainer

Consult and use recommended procedures from your trainer

Consult and use recommended procedures from the technical order

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is the ideal position of the hyster 10k forklift mast prior to performing any maintenance

Raised

Locked

Lowered

Extended

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?