
Electrical Test Equipment
Authored by Joshua Nichols
Specialty
Professional Development
Used 8+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
23 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Lineworkers most commonly us _______ to read AC voltages
Ammeter
multimeter
rotation meter
service conductor tester
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Clamp-on ammeter is used to measure current in the hot-legs and neutral of secondary circuits and services
True
False
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The same phase sequence indicator should be used for initial determination and final confirmation
true
false
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Phase sequence indicator are used on all these except.
Replacing transformer banks
Replacing secondary or services
Rebuilding corner poles
replacing tangent structures
5.
FILL IN THE BLANK QUESTION
1 min • 1 pt
The phasing meter is used to prove phase sequence and read _________.
6.
FILL IN THE BLANK QUESTION
1 min • 1 pt
Phasing is necessary when work is performed on a ________ of the mainline feeder circuits
7.
FILL IN THE BLANK QUESTION
1 min • 1 pt
To prove phasing you should first
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?