3-1 Preconstruction Activities
Authored by Centari Rodriguez
Architecture
University

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
8 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Using a design-bid-build delivery method, an owner hires an architect for the design a two-story mixed-use historic building located over a train station. After completing the design, the architect is now organizing the contract documents on which invited contractors will base their bids.
Which of the following documents should the architect include? Check the three that apply.
Cost estimate
Preservation assessment
Shop drawings
Specifications
Addenda
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A mixed-use commercial project has entered the bid phase. A bidder contacts the owner and architect to propose a cost-saving substitution to the mechanical equipment, stating that they have a strong relationship with a particular manufacturer and can apply a specialty cost savings opportunity to the owner for alternate condensing units. The mechanical engineer has no issue with the performance of the alternate equipment. The owner is interested in the potential cost savings but is concerned about unfairly favoring a bidder.
What action should the architect recommend?
Reject the substitution request as unethical.
Establish an allowance for all condensing units in the project.
Issue an addendum to identify an additional approved manufacturer.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the bidding phase of a public project, an architect notices that the flooring material selected by the owner is missing from the bidding documents.
How should the architect address the missing information?
Recommend that the owner hold an allowance for the material.
Distribute a change order that adds the cost of flooring to the project.
Issue an addendum to all bidders that includes the missing information.
Ask the flooring contractors who are bidding on the project to include the floor.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Two days prior to the bid due date, a major conflict is discovered in the bid documents between the architectural and structural drawings. The conflict will require extensive reworking of the drawings and additional structural steel.
What should the architect issue to bidders?
Architect's supplemental instruction with drawing revisions and a revised bid date.
Addendum that defines the changes and extends the bid due date.
Change order that defines the changes and extends the time of completion.
Construction change directive with a revised substantial completion date.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Refer to the exhibit.
Using standard AIA contracts, a school district receives competitive bids for the renovation and addition of a school building. The school district cannot go over their budget of $2,500,000 and would like to maximize the work that can be completed at the lowest cost. The architect determines all three bidders are qualified.
Which contractor should the architect recommend?
ABC Contractor
Good Contractor
Quality Contractor
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An architect submits a drawing set for a large mixed-use project to the AHJ for building permit plan check. The AHJ is experiencing delays and estimates building permit approval will take 10 months. To make up for the delay, the owner distributes the same drawing set for competitive bidding and provides a 90-day review period for submissions.
The architect is concerned about the potential for plan review comments that may result in design changes and increased construction costs.
How should the architect address this concern?
Provide a contingency for additional architecture design fees in the bidding forms.
Include an allowance for future plan check revisions in the Division 01 specifications and allowance form.
Advise the owner to extend the open bid review timeline to match the estimated building permit approval date.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Following a feasibility study with an architect, the owner of a vehicle maintenance facility wants to construct a 10,000-square-foot addition. The owner does not have any construction experience, wants a guaranteed price, and does not want to manage multiple contracts or disputes.
Which project delivery method should the architect recommend?
Design-bid-build
Integrated project delivery
Design-build
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
Ancient Greek Architecture
Quiz
•
University
10 questions
ACA 2024 01-04
Quiz
•
University
12 questions
Laminated Flooring Brands
Quiz
•
University
10 questions
Monuments of India
Quiz
•
KG - Professional Dev...
10 questions
TEMPLES IN INDIA
Quiz
•
University
10 questions
Romanesque Architecture
Quiz
•
University
10 questions
South Indian Temple Architecture
Quiz
•
University
10 questions
Area and Perimeter
Quiz
•
4th Grade - University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
10 questions
Probability Practice
Quiz
•
4th Grade
15 questions
Probability on Number LIne
Quiz
•
4th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
6 questions
Appropriate Chromebook Usage
Lesson
•
7th Grade
10 questions
Greek Bases tele and phon
Quiz
•
6th - 8th Grade
Discover more resources for Architecture
12 questions
IREAD Week 4 - Review
Quiz
•
3rd Grade - University
20 questions
Endocrine System
Quiz
•
University
7 questions
Renewable and Nonrenewable Resources
Interactive video
•
4th Grade - University
30 questions
W25: PSYCH 250 - Exam 2 Practice
Quiz
•
University
5 questions
Inherited and Acquired Traits of Animals
Interactive video
•
4th Grade - University
20 questions
Implicit vs. Explicit
Quiz
•
6th Grade - University
7 questions
Comparing Fractions
Interactive video
•
1st Grade - University
38 questions
Unit 8 Review - Absolutism & Revolution
Quiz
•
10th Grade - University