pm 3.5

pm 3.5

1st - 5th Grade

23 Qs

quiz-placeholder

Similar activities

5th Grade Reading Practice

5th Grade Reading Practice

5th Grade

20 Qs

Food Science and Technology

Food Science and Technology

KG - University

20 Qs

Bible Challenge

Bible Challenge

3rd - 8th Grade

20 Qs

AVID Best Practices & Principles

AVID Best Practices & Principles

5th - 12th Grade

26 Qs

T0904R - SECTION VIEWS

T0904R - SECTION VIEWS

KG - University

24 Qs

Music Notation

Music Notation

5th Grade

19 Qs

R.I. 5.9

R.I. 5.9

5th Grade

20 Qs

Creative Design with Canva for Kids (SD)

Creative Design with Canva for Kids (SD)

3rd Grade

20 Qs

pm 3.5

pm 3.5

Assessment

Quiz

Specialty

1st - 5th Grade

Easy

Created by

syrym balabekov

Used 5+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the deheptenization column in the section 650?

Separatio n of paraxylene from C8+

Isomerization

removal of xylene from paraxylene

No answer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where do the raw materials for the 800 sections come from?

section 100

section 400

section 300

section 650

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What product leaves the column C-801 ?

light and heavy raffinate

benzene and toluene

fractions C8-C9

aromatic hydrocarbons

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Till which temperature the refrigerant that enters the installation of RK-901 is cooled?

From 6 to 3 degrees

From 9 to 6 degrees

From 10to 7 degrees

From 8 to 5 degrees

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is going gas which leaves the tank C-909?

Reservoir tank

Flare system plant

Section 600

Section 100

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is fuel gas and liquid fuel come from for sections 900?

From factory network

From section 100

From section 400

From reservoir tank

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the percentage of the minimum capacity of the plant, which maintains the production of products of the required quality?

60% of design capacity

40% of design capacity

80% of design capacity

50% of design capacity

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?