
Prima parte QM
Authored by Me 91
Special Education
Professional Development
Used 12+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
28 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
During the production inspection, which elements does the system use to determine the layout of defects recording? There are 3 correct answers to this question.
Confirmation profile
Report type
Status profile
Catalog Profile
Partner Profile
2.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
Which of the following sample categories can be maintained in thesample-drawing item? There are 3 correct answers to this question.
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
The receipt of a quality certificate should be recorded independently from the goods receipt. What is the necessary setting to fulfill this requirement?
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
A regular inspection of the test equipment is required. Test Equipment Management should be used for this purpose. What event triggers the automatic creation of an inspection lot for calibration inspection?
5.
MULTIPLE SELECT QUESTION
15 mins • 1 pt
During quality notification processing, the activities from the action box can be used. How can the activities be documented in the quality notification? There are 2 correct answers to this question.
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following inspection lot origins allows the creation of inspection lots for samples?
7.
MULTIPLE SELECT QUESTION
15 mins • 1 pt
Which inspection point types exist in Quality Management in SAPS/4HANA? There are 3 correct answers to this question.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?