Search Header Logo

Seconda parte QM

Authored by Me 91

Special Education

Professional Development

Used 11+ times

Seconda parte QM
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

32 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

You create a complaint against a supplier with reference to the material document year, number, and item. You create it from a goods receipt for the purchasing document.What information is copied to the notification? There are 3 correct answers to this question

Inspection lot number
Reference quantity and unit
Advanced shipping number
Purchasing document number and item
Material number

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You want to use a purchasing process with release stages (for example, first-article, preliminary series, regular procurement) and different inspection plans for each stage. How do you configure this process?

By assigning a status profile to the business partner
By assigning a status profile to the quality info record: Procurement
By assigning a status profile to the inspection type settings in the customizing
By assigning a status profile to the inspection type settings in the material master

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You have configured the system so that inspection lots are created for delivery items automatically. What does the system do if the sample size of the inspection lot has not been calculated and you remove the respective delivery item?

The system cancels the lot.
The system posts a usage decision.
The system sends a workflow message to the quality technician.
The system marks the lot for cancellation.

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which objects must be combined in test scheduling in the stability study? There are 3 correct answers to this question.

Samples
Strategy
Initial Sample
Sample-drawing procedure
Inspection plans

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following assignments of document types to master data objects is available in SAP standard? There are 2 correct answers to this question.

Technical delivery terms to quality info records: Procurement
Technical delivery terms to materials
Quality assurance agreements to materials
Quality assurance agreements to quality info records: Procurement

6.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which of the following can automatically create a quality notification? There are 2 correct answers to this question.

Confirmations for operations from maintenance orders
Rejection of an inspection characteristic in the result recording
Confirmations for operations from production orders
Usage decision for an inspection lot

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Which graphical nets are provided in the Manage FMEAs app? There are 2 correct answers to this question.

Graphical net for a structure analysis
Graphical net for a function analysis
Graphical net for causes with preventive actions
Graphical net for causes with detection actions

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?