TechMD-IEC Module 3

TechMD-IEC Module 3

Professional Development

10 Qs

quiz-placeholder

Similar activities

WCM - Chpt2

WCM - Chpt2

Professional Development

13 Qs

F023 TAv 21 - Comms EO 21.01

F023 TAv 21 - Comms EO 21.01

Professional Development

14 Qs

Electric Industry Literacy Overview

Electric Industry Literacy Overview

Professional Development

12 Qs

Lockdown Quiz 1

Lockdown Quiz 1

Professional Development

10 Qs

FKI Sem. 2 Thn 2023 Sesi 3

FKI Sem. 2 Thn 2023 Sesi 3

Professional Development

10 Qs

PDI Workshop 10

PDI Workshop 10

Professional Development

13 Qs

Drafting by Sir AL

Drafting by Sir AL

Professional Development

15 Qs

Lat/Long Coordinates Test Review

Lat/Long Coordinates Test Review

Professional Development

14 Qs

TechMD-IEC Module 3

TechMD-IEC Module 3

Assessment

Quiz

Other

Professional Development

Medium

Created by

Phoebe Adriano

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. What is the NGCP standard line to line clearance between 230kV transmission line and 69kV underbuilt line?

3.30 meters

3.31 meters

3.32 meters

3.33 meters

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. What is the desired footing resistance of structures to effectively dissipate power surges to ground?

Infinity

10 ohms and above

5 ohms and below

5 ohms and above

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. What is the final event that lead to the issuance of the Alert Bulletin No. 11?

  1. Double line outage of Mexico – Hermosa 230kV Lines 1 & 2

  1. Double line outage of Hermosa – BCCP 230kV Lines 1 & 2

  2. Double line outage of Hermosa – Limay Lines 1 & 2

  1. Double line outage of Hermosa – Limay Lines 1 & 2

  1. Double line outage of BCCPP – Lamao 230kV Lines 1& 2

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. What is Alert Bulletin No. 11 all about?

  1. Oil Spill Mitigation Protocol in NGCP Facilities

  1. Oil Spill Symposium Frequently Asked Questions (FAQ)

  1. Mitigation of Lightning-Related Outages

  1. Line-to-Line Clearance Requirements Between NGCP Transmission Lines and Underbuilt Structure Lines

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. How many recommendations are listed in Project THOR?

  1. 10

5

  1. 7

  1. 12

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. What is the desired OHGW shielding angle?

  1. Approaching 0o

  1. ± 30o

  1. Above 30o

  1. Below 30o

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

  1. What is Alert Bulletin No. 9 all about?

  1. Oil Spill Mitigation Protocol in NGCP Facilities

  1. Oil Spill Symposium Frequently Asked Questions (FAQ)

  1. Mitigation of Lightning-Related Outages

  1. Line-to-Line Clearance Requirements Between NGCP Transmission Lines and Underbuilt Structure Lines

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?