BUILDING 41 - 80

BUILDING 41 - 80

Professional Development

40 Qs

quiz-placeholder

Similar activities

Strategy of Effective and Creative Class Management

Strategy of Effective and Creative Class Management

Professional Development

36 Qs

SCOUTING SKILL TEST

SCOUTING SKILL TEST

1st Grade - Professional Development

40 Qs

BC T001

BC T001

Professional Development

40 Qs

Reasoning Aptitude

Reasoning Aptitude

University - Professional Development

43 Qs

Module 6 - Pedestal grinder

Module 6 - Pedestal grinder

Professional Development

36 Qs

health assessment

health assessment

Professional Development

45 Qs

Latihan Metpem

Latihan Metpem

Professional Development

35 Qs

PELATIHAN KEWIRAUSAHAAN BAGI NON ASN (5-7 FEB 24)

PELATIHAN KEWIRAUSAHAAN BAGI NON ASN (5-7 FEB 24)

Professional Development

40 Qs

 BUILDING 41 - 80

BUILDING 41 - 80

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Easy

Created by

Fernando Lop

Used 8+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Work must commence within ____ days after permit issuance or else the permit will expire.

60

90

180

365

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False. Rooftop-mounted photovoltaic panels, along with the rack support system, shall have their live load indicated on the construction documents.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Landscaped areas of occupied roof gardens shall be designed with a uniform design live load of _____ psf.

20

40

60

100

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Special inspections of sprayed fire-resistant materials applied to wide-flange columns shall have thickness measurements taken at ____ locations around the column.

7

10

12

25

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The installation of open-web steel joists and joist girders within a structure are required to have _______ special inspections.

Periodic

Continuous

Both A & B

None

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Buildings of Type I or II construction are permitted to use fire-retardant-treated wood in nonbearing partitions where the fire-resistance rating is ____ hours or less.

1/2

1

2

3

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum allowable area of unprotected exterior wall openings for a nonsprinklered building having a fire separation distance of 4 feet?

Not Permitted

10%

15%

25%

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development